• Ingen resultater fundet

Questions and Answers # 1-2 Tender for Consultancy Services for the Danish Energy Partnership Programme (DEPP), Phase II with Mexico, China, South Africa and Viet Nam.

N/A
N/A
Info
Hent
Protected

Academic year: 2022

Del "Questions and Answers # 1-2 Tender for Consultancy Services for the Danish Energy Partnership Programme (DEPP), Phase II with Mexico, China, South Africa and Viet Nam."

Copied!
1
0
0

Indlæser.... (se fuldtekst nu)

Hele teksten

(1)

Questions and Answers # 1-2

Tender for Consultancy Services for the Danish Energy Partnership Programme (DEPP), Phase II with Mexico, China, South Africa and Viet Nam.

Question #1:

Can you confirm that it is rightly understood that Appendix 6 'Declaration of Support' should only be submitted (at proposal stage) for economic entities in the grouping which are/will be jointly and severely liable. Following from this, can you confirm that the Applicant can rely on technical capacity of economic entities such as references to meet technical criteria in prequalification (but not financial capacity) without these entities being jointly and severable liable with the applicant?

Answer #1:

Appendix 6 “Declaration of Support” is to be used whenever an economic entity relies on another economic entity’s capacity to meet the criteria in the prequalification.

If the entity relies on another economic entity to meet the financial criteria, they will be jointly and severely liable for the fulfillment of the contract to the extent that it is within the financial support granted.

If the entity relies on another economic entity to meet the professional or technical requirements, the supporting entity will not be jointly and severally liable for the economy, but will be required to provide the resources they support with, for the performance of the contract.

If you require support to meet the technical or professional requirements, it is a requirement that it is the supporting company that carries out the tasks that lies within the capacity with which they support.

Question #2:

In the tender documents it is mentioned that the consultant has to provide “6 references from the past five years within the area of the offered contract. The work must be commenced and if the work is completed it must have been carried out within the last five years.” Based on the above, it is our understanding that projects which were implemented between October 2012 and October 2017 can be used as eligible references. Hence, we assume a project which was implemented between 2014 and 2016 would be clearly eligible? But would a project which was implemented between 2010 and 2016 also qualify?

Answer #2:

Yes, it is correct, that projects which were implemented between October 2012 and October 2017 can be used as eligible references, and that projects which was implemented between 2014 and 2016 would be clearly eligible.

A project which was implemented between 2010 and 2016 will qualify, if the tasks solved within the past three years meets the requirements for the reference. Thus, if you have carried out tasks which are within the area of the offered contract from e.g. 2014 – 2016 the reference would clearly be eligible.

Referencer

RELATEREDE DOKUMENTER

means the confidence of an entity on another entity based on the expectation that the other entity will perform a particular action important to the trustor, irrespective of the

1) Maximum active power setpoint where the entity will provide FCR, and maximum droop, and corresponding controller parameter sets, where the entity will provide FCR. 2)

In the situations, where the providers are private companies, such as providers under the pub- lic health insurance scheme (out-patient services) cost information is not brought

The tests shall be carried out with the highest droop (i.e. lowest regulating strength or gain) and the highest load (i.e. highest active power output) at which the entity

The tests shall be carried out with the highest droop (i.e. lowest regulating strength or gain) and the highest load (i.e. highest active power output) at which the entity

Freedom in commons brings ruin to all.” In terms of National Parks – an example with much in common with museums – Hardin diagnoses that being ‘open to all, without limits’

The CCM secures operational security (Article 3(c) of the CACM Regulation) as the grid constraints are taken into account in the day-ahead and intraday timeframe providing the

(a) each element has an influence factor on electrical values, such as voltages, power flows, rotor angle, in the TSO's control area greater than common contingency influence