SMART GRID OPEN

Standardisation - Conformance testing - Smart Grid ready

Kjeld Nørregaard, Senior Projektleder.

+45 7220 1317, kjn@teknologisk.dk, Teknologisk Institut, Aarhus

Smart Grid Ready Label – eksempel på Smart Grid Open- testmetode

Avanceret energilagring 2015 - Smart energilagring, varmepumper og batterier

Konference 1. December 2015 Teknologisk Institut, Aarhus

(2)

Flere Domæner er berørt i SGO

Experience from the EnergyFlexHouse used as a basis for the technical conformance test specifications.

A dialog with the produceres and system integrators of Smart Grid products is essential for SGO project.

Home Automation

Heat Pumps

Photo Voltaics

Electric Vehicle

ForskEL project no: 10662 Storage

    ?

SG Ready

label?

(3)

SG Ready BWP proposal i SGO kontekst?

(4)

SG Ready label til varmepumper

Smart Grid Ready varmepumper findes måske allerede med standard interface – i stort tal

• Hvad kan de?

• Hvem står bag?

• Certificering?

Nyttig for en dansk forbruger?

• Forudsætninger og betingelser

(i Tyskland)

(5)

SG Ready label til varmepumper

På det 10. Forum Wärmepumpe i Berlin 9. November 2012 præsenterede

Bundesverband Wärmepumpe e.V.

„SG Ready“-certificering af varmepumper i Tyskland.

17 leverandører står bag og vil benytte mærket.

De første modeller med SG Ready label fremvist på ISH i marts 2013.

878 varmepumper er optaget på listen *) som SG Ready per 17. aug. 2015

*) BWP Modell-Liste "SG Ready"-Label für Smart-Grid-fähige Wärmepumpen (Stand: 17.08.2015)

Forbrugeren kan i fremtiden kende en Smart Grid egnet varmepumpe på

SG Ready-logo mærket

(kilde: BWP)

(6)

SG Ready 2-bit protokol

Kilde: Bundesverband Wärmepumpe (BWP) med SGO kommentarer:

Betriebszustand 1 (1 Schaltzustand, bei Klemmenlösung: 1:0):

Dieser Betriebszustand ist abwärtskompatibel zur häufig zu festen Uhrzeiten geschalteten EVU-Sperre und umfasst maximal 2 Stunden „harte“ Sperrzeit.

”Must Stop”. Denne indstilling slukker for varmepumpen, bagudkompatibel til

tidsbestemt EVU signal anvendt af tyske energileverandører, og inkluderer højest to timers ”hård” slukning.

Betriebszustand 2 (1 Schaltzustand, bei Klemmenlösungen: 0:0):

In dieser Schaltung läuft die Wärmepumpe im energieffizienten Normalbetrieb mit anteiliger Wärmespeicher-Füllung für die maximal zweistündige EVU-Sperre.

”Normal drift”. I denne indstilling kører varmepumpen efter energieffektive normale grænser, med varmefylde-rata for højest 2 timers off.

For at være SG Ready skal varmepumpen ifølge Bundesverband Wärmepumpe (BWP) kunne styres af to styresignaler, til at arbejde i fire forskellige tilstande

4 forskellige SG Ready modes bestemmes af 2 styresignaler Normal drift og 3 unormale SG Ready styrede tilstande:

Stop i op til 2 timer, Øget drift, Kør maximum

(7)

SG Ready 2-bit protokol

Betriebszustand 3 (1 Schaltzustand, bei Klemmenlösung 0:1)

In diesem Betriebszustand läuft die Wärmepumpe innerhalb des Reglers im verstärkten Betrieb für Raumheizung und Warmwasserbereitung.

 Es handelt sich dabei nicht um einen definitiven Anlaufbefehl, sondern um eine Einschaltempfehlung entsprechend der heutigen Anhebung.

”High”. Med denne indstilling kører varmepumpen indenfor gængse regler med forøget opvarmning af rum og varmandsbeholder.

Dette forcerer IKKE varmepumpen til at køre, men øger opvarmning i henhold til en effekt-anbefaling.

Kilde: Bundesverband Wärmepumpe (BWP) med SGO kommentarer:

(8)

SG Ready 2-bit protokol

Betriebszustand 4 (1 Schaltzustand, bei Klemmenlösung 1:1)

Hierbei handelt es sich um einen definitiven Anlaufbefehl, insofern dieser im Rahmen der Regeleinstellungen möglich ist.

Für diesen Betriebszustand müssen für verschiedene Tarif- und

Nutzungsmodelle verschiedene Regelungsmodelle am Regler einstellbar sein:

Variante 1: Die Wärmepumpe (Verdichter) wird aktiv eingeschaltet.

Variante 2: Die Wärmepumpe (Verdichter und elektrische Zusatzheizungen) wird aktiv eingeschaltet, optional: höhere Temperatur in den Wärmespeichern

”Must Max”. Her omhandles en indstilling, der forcerer varmepumpen til at køre, så længe dette er muligt indenfor reglerne. For denne indstilling skal der være forskellige tarif- og anvendelsesmodeller til forskellige reguleringsmodeller for regulatoren.:

Version 1: Varmepumpen (kompressoren) bliver tændt aktivt

Version 2: Varmepumpen (kompressoren og elvarmepatron) bliver aktivt tændt Valgfrit: højere temperatur i varmelageret.

Kilde: Bundesverband Wärmepumpe (BWP) med SGO kommentarer:

(9)

SG Ready 2-bit protokol

SG-Mode-reaktion

Bit 1 Lav / Øget

Bit

0 0 1

Tvang / No rm al

0

Normal Operation

VP optager midlertidigt (<2 timer) mere elektrisk effekt end i Normal Operation.

Komfort grænser har prioritet

På grund af priser anbefales oplagring af varme i rum og

akkumuleringstanke.

1

Varmepumpen stoppes midlertidigt (<2 timer).

Frostsikring eller minimum komfort grænse har

prioritet

VP optager midlertidigt (<2 timer) mere elektrisk effekt end i Normal Operation.

Høje sikkerhedsgrænser har prioritet

Problemer i elnettet (f.eks.

manglende produktion, lokal underspænding) eller deltagelse i aggregeret salg (VPP) kræver varmepumpen

stoppet.

På grund af problemer med overspænding i elnettet lokalt

kræves højeste last

SG-Mode Bit 1 Low / High Bit

0 0 1

Fo rc e d / nor ma l 0 Normal

Operation High

1 Must Stop Must Max

SGO forståelse af hhv

Kommando Forventet reaktion

Formål: Formål:

Formål:

(10)

SG Ready 2-bit protokol

SG-Mode-reaktion?

Bit 1 Lav / Øget

Bit 0 0 1

Tvang / Normal

0 Normal Drift

Anbefalet øgning af setpunkter med

f.eks. 3°

1

Setpunkter ændres midlertidigt til frostsikring eller minimum komfort

grænse

Setpunkter øges midlertidigt til maximum indenfor sikkerhedsgrænser SG-Mode

Bit 1 Low / High

Bit 0 0 1

Forced / normal

0 Normal Operation High

1 Must Stop Must Max

SGO forståelse af hhv

Kommando Forslag til forståelse af

forventet reaktion

(11)

SG Ready 2-bit protokol

Bundesverband Wärmepumpe (BWP) har en label-kommission, der bevilger adgang til at benytte SG Ready label på en varmepumpe.

Sammensætning af label-kommissionen og betingelserne for bevilling er endnu ikke kendt (ud over betaling af label-gebyr og kontingent til BWP).

Det fremgår ikke af SG Ready betingelser, at der forudsættes en godkendt test.

Overensstemmelsestest?

2 elektriske diskrete signaler styrer 4 forskellige SG Ready modes

Hvor svært kan det lige være at teste 4 kombinationer af 2 signaler?

Leverandørerne kan nemt realisere og teste denne funktionalitet?

(12)

2 bit til 4 modes til 12 deltest

Not running

Normal Operation High

Must Stop Must Max

1 2

3

4

5 6

7

8

9 10

11 12

2 timer maksimum aktivering af

ikke normale SG Ready modes

(13)

Test setup - overview

House simulator

DTI test load Heat

Pump

SG Ready simulation

Temperature measurement

Power measurement

Energy flow measurement

XMPP gateway

Electric power Indoor

temp-sensor

Hot water simulator

Hot water temp-sensor

Outdoor simulator

Outdoor temp-sensor Storage simulator

Storage

temp-sensor

(14)

Testresultater Test 2

• Kompressor starter kun efter kompressor timeout

HP

Ønsket FremløbsTem peratur

Målt Aktiv

Effekt på HP Fra Mode Til Mode HP

Ønsket

FremløbsTemperatur

Målt Aktiv Effekt på HP HP

Ønsket

FremløbsTemperatur

Målt Aktiv Effekt på HP Kører Normalt level Normalt niveau Normal Operation Must Stop Stopper Ingen Ændring Faldende til lav Stopper Ingen Ændring Faldende til lav Kører Ikke Normalt level Lavt Niveau Normal Operation Must Stop Kører Ikke Ingen Ændring Ingen Ændring Kører Ikke Ingen Ændring Ingen Ændring Kører Normalt level Højt niveau Normal Operation High Kører Stigning til High Level Stigende til høj Kører Stigning til High Level Stigende til høj Kører Ikke Normalt level Lavt Niveau Normal Operation High Starter Stigning til High Level Stigende til høj Starter Stigning til High Level Stigende til høj Kører Normalt level Højt niveau Normal Operation Must Max Kører Stigning til Must Max Level Stigende til høj Kører Stigning til Must Max Level Stigende til høj Kører Ikke Normalt level Lavt Niveau Normal Operation Must Max Starter Stigning til Must Max Level Stigende til høj Starter/Starter IkkeStigning til Must Max Level Stigende til høj Kører Ikke Normalt level Lavt Niveau Must Stop Normal Operation Starter Ingen Ændring Stigende til høj Starter Ingen Ændring Stigende til høj Kører Ikke Normalt level Lavt Niveau Must Stop High Starter Stigning til High Level Stigende til høj Starter Stigning til High Level Stigende til høj Kører Ikke Normalt level Lavt Niveau Must Stop Must Max Starter Stigning til Must Max Level Stigende til høj Starter/Starter IkkeStigning til Must Max Level Stigende til høj Kører Normalt level Normalt niveau Must Stop Normal Operation Kører Ikke Ingen Ændring Ingen Ændring Kører Ikke Ingen Ændring Ingen Ændring Kører Normalt level Højt niveau Must Stop High Kører Ikke Stigning til High Level Ingen Ændring Kører Ikke Stigning til High Level Ingen Ændring Kører Normalt level Højt niveau Must Stop Must Max Kører Ikke Stigning til Must Max Level Ingen Ændring Kører Ikke Stigning til Must Max Level Ingen Ændring Kører High level Normalt niveau High Normal Operation Kører Falder til Normalt level Faldende til lav Kører Falder til Normalt level Faldende til lav Kører Ikke High level Lavt Niveau High Normal Operation Kører Ikke Falder til Normalt level Faldende til lav Kører Ikke Falder til Normalt level Faldende til lav Kører High level Højt niveau High Must Max Kører Stigning til Must Max Level Stigende til høj Kører Stigning til Must Max Level Stigende til høj Kører Ikke High level Lavt Niveau High Must Max Starter Stigning til Must Max Level Stigende til høj Starter/Starter IkkeStigning til Must Max Level Stigende til høj Kører High level Normalt niveau High Must Stop Stopper Falder til Normalt level Faldende til lav Stopper Falder til Normalt level Faldende til lav Kører Ikke High level Lavt Niveau High Must Stop kører Ikke Falder til Normalt level Faldende til lav kører Ikke Falder til Normalt level Faldende til lav Kører Must Max level Normalt niveau Must Max Normal Operation Kører Falder til Normalt level Faldende til lav Kører Falder til Normalt level Faldende til lav Kører Must Max level Højt niveau Must Max High Kører Falder til High Level Faldende til lav Kører Falder til High Level Faldende til lav Kører Must Max level Normalt niveau Must Max Must Stop Stopper Falder til Normalt level Faldende til lav Stopper Falder til Normalt level Faldende til lav Kører Ikke Must Max level Lavt Niveau Must Max Normal Operation Kører Falder til Normalt level Stigende til høj Kører Falder til Normalt level Stigende til høj Kører Ikke Must Max level Lavt Niveau Must Max High Kører Falder til High Level Stigende til høj Kører Falder til High Level Stigende til høj Kører Ikke Must Max level Lavt Niveau Must Max Must Stop Kører Ikke Falder til Normalt level Ingen Ændring Kører Ikke Falder til Normalt level Ingen Ændring

Action Forventet Resultat Resultat

Før

(15)

Heat Pump

Static Simulator

DTI Test Load House Simulator

Indoor Temp Sensor

Outdoor Simulator Outdoor Temp Sensor

Buffer Tank Simulator Buffer Tank Temp Sensor

Hot Water Simulator Hot Water Temp Sensor

Energy Flow Measurement

Power Measurement Temperature Measurement

Electric Power Dynamic Simulator

SG Ready Stimulation SG Ready Mode Dynamic House Logic

House Stimulation Communication

Converter

From Static Energy Flow Measurements Active Power Measurements Analyser

DataLogning

Ref. Temp SG Ready Mode Feedback

Reporting

Test Report Conformance Verification

Verification of SG Ready

Measurement Data From Static Energy Flow Measurements Active Power Measurements Temperature Measurements SG Ready Mode

Energy Flow Active Power Temperatures

Reports

Smart Grid Controller Box (Can be part of Heat Pump)

Aggregator SG protocol Switch Data replication SG communication

Communication Converter

SG protocol

Data Logning SG protocol

Hot Watwer Stimulation Communication

Converter Outdoor Stimulation

Communication Converter Buffer Tank Stimulation

Communication Converter

SG communication

Results

Data

SG Ready Mode logic

Measured Data

Smart Grid Connection Point

Smart Grid Controller

Box Aggregator is not part of SG Ready Test

Time Reference

Data Logging Signals

Power & Control Test Signals

TestSetup_verE_ver02.vsd 12-06-2015 Proj:2002495 © Teknologisk Institut 2015

Generic Test Setup for Smart Grid Ready Heat Pump Conformance Testing.

SG protocol

(16)

Simplificeret dynamisk varmepumpe test

T

amb

Heat Pump

T

in

T

f

T

r

Q

loss

T

radiator

Q

radiator

T

amb

T

in

T

radiator

P

heatpump

Heatcapacity heatingsys Heatcapacity

House

Q

loss

Q

radiator

R

h

R

r

C

r

C

h

I

1

I

2

I

3

(17)

Heat Pump

Static Simulator

DTI Test Load House Simulator

Indoor Temp Sensor

Outdoor Simulator Outdoor Temp Sensor

Buffer Tank Simulator Buffer Tank Temp Sensor

Hot Water Simulator Hot Water Temp Sensor

Energy Flow Measurement

Power Measurement

Temperature Measurement

Electric Power Dynamic Simulator

SG Ready Stimulation SG Ready Mode Dynamic House Logic

House Stimulation Communication

Converter

From Static Energy Flow Measurements Active Power Measurements Analyser

DataLogning

Ref. Temp SG Ready Mode Feedback

Reporting

Test Report Conformance Verification

Verification of SG Ready

Measurement Data From Static Energy Flow Measurements Active Power Measurements Temperature Measurements SG Ready Mode

Energy Flow Active Power Temperatures

Reports

Smart Grid Controller Box (Can be part of Heat Pump)

Aggregator SG protocol Switch Data replication SG communication

Communication Converter

SG protocol

Data Logning SG protocol

Hot Watwer Stimulation Communication

Converter Outdoor Stimulation

Communication Converter Buffer Tank Stimulation

Communication Converter

SG communication

Results

Data

SG Ready Mode logic

Measured Data

Smart Grid Connection Point

Smart Grid Controller

Box Aggregator is not part of SG Ready Test

Time Reference

Data Logging Signals

Power & Control Test Signals

TestSetup_verE_ver02.vsd 12-06-2015 Proj:2002495 © Teknologisk Institut 2015

Generic Test Setup for Smart Grid Ready Heat Pump Conformance Testing.

SG protocol

(18)

Normal Must Stop High Must Max SG-Ready mode =

SG-Ready conformance test in simulated environment

Initial test with dynamic house temperature feedback but no water temperature feedback.

DUT: Heat Pump no. SGO-04 / 20151130 DUT: Heat Pump no. SGO-04 / 20151130

Power Duty cycle

Mode high low period

normal 0,49 0,51 9122

high-mode 0,51 0,49 9182

Must Max 0,55 0,45 9599

(19)

Heat Pump

Static Simulator

DTI Test Load House Simulator

Indoor Temp Sensor

Outdoor Simulator Outdoor Temp Sensor

Buffer Tank Simulator Buffer Tank Temp Sensor

Hot Water Simulator Hot Water Temp Sensor

Energy Flow Measurement

Power Measurement

Temperature Measurement

Electric Power

Dynamic Simulator

SG Ready Stimulation SG Ready Mode Dynamic House Logic

House Stimulation Communication

Converter

From Static Energy Flow Measurements Active Power Measurements

Analyser

DataLogning

Ref. Temp SG Ready Mode Feedback

Reporting

Test Report Conformance Verification

Verification of SG Ready

Measurement Data From Static Energy Flow Measurements Active Power Measurements Temperature Measurements SG Ready Mode

Energy Flow Active Power Temperatures

Reports

Smart Grid Controller Box (Can be part of Heat Pump)

Aggregator SG protocol

Switch

Data replication SG communication

Communication Converter

SG protocol

Data Logning SG protocol

Hot Watwer Stimulation Communication

Converter Outdoor Stimulation

Communication Converter Buffer Tank Stimulation

Communication Converter

SG communication

Results

Data

SG Ready Mode logic

Measured Data

Smart Grid Connection Point

Smart Grid Controller

Box Aggregator is not part of SG Ready Test

Time Reference

Data Logging Signals

Power & Control Test Signals

TestSetup_verE_ver02.vsd 12-06-2015 Proj:2002495 © Teknologisk Institut 2015

Generic Test Setup for Smart Grid Ready Heat Pump Conformance Testing.

SG protocol

(20)

Outline for final results...

Test system

Reference system

ForskEL project no: 10662

(21)

Findings fra forsøgte conformance tests

• Varmepumpens reaktion på Smart Grid styring kan testes

• Det giver god mening at benytte dynamisk test ved SG Ready verificering

• Ikke alle produkter på SG Ready listen, reagerer som forventet

• Der er behov for certificering af Smart Grid Ready funktionalitet

• (Rygtet vil vide at varmepumper med EVU styring automatisk er optaget på SG Ready listen hos BWP i Tyskland

- og det kan ikke afvises på basis af de første par stikprøver.)

!

(22)

Hvad nu hvis……?

De to diskrete signaler synes primært at være rettet mod at kunne understøtte lokale elnet med f.eks. store andele af PV, som kan skabe både overspænding og mangel ved pludselig udfald.

• SG Ready MustStop og MustMax modes kan være nyttige for netselskabet, hvis reaktionen kommer hurtigt.

• SG Ready MustStop og High modes kan være nyttige for en aggregator.

• Netselskab har altid prioritet over aggregator, hvis begge parter benytter signalerne.

I forhold til at kunne understøtte elnettet lokalt, kan samme to signaler så også bruges til parallelt at styre andre af de SG relevante apparater i samme installation?

• SGO projektet laver forslag til hensigtsmæssig reaktion på SGO Ready modes for forskellige apparater herunder elbil-hjemmeladning, PV-anlæg og lagring.

BWP SG Ready

SGO Mode

SGO Mode

Description Heat Pump

EV Home- charger

PV System (no storage)

PV inverter with local battery

Home Battery (Power Wall) Must Stop 1

SGO - Minimum Load

Min Consumption

Min Charging (eg. 6 A)

Max Production

Max Production (PV+BAT to grid)

Max Production Normal

Operation 2

SGO - Normal Operation

Normal Operation

Inteligent Charging

Normal

Production Normal Production

Normal Operation

High 3

SGO - Charge Storage

High Operation

High Charging

Normal Production

PV no limit Recommend Charge

Recommend Charge Must Max 4 SGO - Max Load

Max Consumption

Max Charging

Stop Production

Stop PV, Max BAT

charging Max Charging

(23)

Tysk styring på PV-anlæg > 100kW

Eksempel fra SMA teknisk note: NR_PowerRed-UEN104311 Version 1.1. Requirements according to §66 EEG 2009

Styring af PV anlæg med to ripple signaler kan anvendes visse steder i Tyskland, jf. teknisk note fra SMA.

Det anses derfor ikke som

urelevant at overveje, om og i givet fald hvordan de samme to signaler bedst og billigst kan benyttes til at understøtte øget andel af

vedvarende energi i elnettet, ved

samtidig at kunne styre flere

apparater.

(24)

Electric Vehicle Supply Equipment

Electric Vehicle

Static Simulator

SG-Ready Controller SGó PWM Control Signal

Power Measurement Electric Power

From Charging Spot Dynamic Simulator

SG Ready Stimulation

SG Ready Mode From Static

Energy Flow Measurements Active Power Measurements Analyser

DataLogning

Ref. PWM Control Signal SG-Ready Mode Feedback

Reporting

Test Report Conformance Verification

Verification of SG Ready

Measurement Data

From Static Energy Flow Measurements Active Power Measurements SG Ready Mode

Energy Flow Active Power

Reports

Smart Grid Controller Box (Can be part of EVSE)

Aggregator SG protocol Switch Data replication SG communication

Communication Converter

SG protocol

Data Logning SG protocol SG communication

Results

Data

SG Ready Mode logic

Measured Data

Smart Grid Connection Point

Smart Grid Controller

Box Aggregator is not part of SG Ready Test

Time Reference

Data Logging Signals

Power & Control Test Signals

TestSetup_verA_ver02.vsd 01-12-2015 Proj:2002495 © Teknologisk Institut 2015

Generic Test Setup for Smart Grid Ready EV Conformance Testing.

Smart Grid Connection Point

SG protocol

SG-Ready

(25)

Outline for final results...

Udestående arbejde i SGO projektet

• Semi automatiseret test på en ”black box” inverter styret varmepumpe

• Verificering af analyse-metode til resulterende effektdata

• Test setup for SGO Ready hjemmelader for mode-3 elbil

• Kombineret parallel SGO Ready test af varmepumpe og hjemmelader

• Final reporting

Foreløbige anbefalinger

Varmepumpebranchen bør overveje om afbrydelse af elpatron i ”Must Stop”-mode er nok

• Elpatronen aktiveres kun sjældent i almindelige varmepumpesystemer

• Effekten på el-balance vil være marginal i forhold til Stop af kompressor OG elpatron

Varmepumpebranchen bør måske også overveje anbefalet funktion i ”Must Max”-mode

• Umiddelbar start af kompressor alene

• (langsom reaktion, og måske kun i kort tid)

• Umiddelbar start af elpatron alene

• (hurtig reaktion, men måske kun i kort tid)

• Umiddelbar start Begge

• (hurtig reaktion, men måske kun i meget kort tid)

Referencer

RELATEREDE DOKUMENTER

Vi har også alle en stor viden om psykiske lidelser, som vi bruger helt praktisk, når vi skal hjælpe de unge med arbejde eller uddannelse.. Det nytter jo ikke, at en ung med

Overvægtige børn vokser normalt godt. Hvis ikke bør de henvises til børneafdeling 53. &lt; -2 SD) eller lav højde i forhold til søskende/forældre eller højde-for-alder krydset

4.2 Et effektivt marked vil skabe en fælles indsats og realisere Smart Grid- potentialet..

Eksempel på kalibrering i tørblokkalibrator i hjemmefremstillet dorn med indskudt referenceføler. Normalt kalibreres overfladeføleren på sit monteringssted med et infrarødt

• Test a new heat pump controller with smart grid functionality.. • Develop a simple tool for

Smart grid i Danmark, Energinet.dk Smart Grid definition, www.smartgrids.eu What’s So Smart about the Smart Grid?, Booz&amp;CO 2008 European Technology Platform

Udfordringer, som kommer til udtryk i form af lav og faldende fertilitet, tidskonflikter mellem arbejde, familie og omsorg, manglende ligestilling mellem kønnene både i den private

For electricity use the existing level of 24 kWh/m², year is aimed to be reduced to 6 kWh/m², year by the most advanced solutions for energy efficient ventilation, pumps, lighting