Smart Grid – Power to Control Energy
September 2015, Jonas Kehr ABB A/S
Converters & Battery Energy Storage Systems
Why Energy Storage is needed
Energy storage applications
ABB offering: Converters & Systems
Converter Technology Overview
ABB References
© ABB Group
September 18, 2015 | Slide 2
Battery Energy Storage Systems
Overview
Challenges of the future power grid Long term drivers of energy storage
Wind & solar power
Natural gas & oil prices
T&D bottlenecks
Power quality issues
Ancillary services
Renewable penetration
Tools for stabiliy: interconnections, T&D upgrades, flexible generation, demand side management, and energy storage
Grid connected Energy Storage Installation base as of 2014
130’000 MW
Compressed Air Energy Storage, 440 MW
Sodium-Sulfur Battery, 320 MW
Lithium Ion Battery 290 MW
Lead-acid Battery, 80 MW
Flywheel energy storage, 40 MW
Redox Flow battery, 13 MW
Pumped hydro
Source: Fraunhofer Institute, EPRI, ABB, DOE Global Energy Storage Database
© ABB Group
Energy Storage Applications
Grid Connected Energy Storage Applications
ESS
Integration of renewables
1-100 MW,1-10h Peak shaving
0.5-10 MW, 1h 220 kV
110 kV
20 kV ring 20 kV
Conventional Central Generation
Variable Renewable Generation
220 KV Load leveling
for generation utilization 10-1000 MW, 1-8h
ESS
110 kV Industry/
Large Commercial Load Center
20 kV
ESS
Spinning reserve In case of line loss 10-500 MW, 0.25-1 h
Load leveling
for postponement of grid upgrade 1-10 MW, 1-6h
ESS
ESS
Frequency Regulation 1-50 MW, 0.25-1h 220 kV
110 kV
ESS
Solar PV time shift 1-100 kW, 2-6h
ESS
0.4 kV
Residential/Small Commercial ESS
Micro-grid
Stabilization 0.1-5 MW, 5 min
Battery Energy Storage Systems Applications load profiles
Power
Station Wind power
Solar power Residential
loads
Industrial loads Peak Shaving
Spinning Reserves
Load Levelling
Capacity firming
ABB offering:
Converters & Systems
© ABB Group
September 18, 2015 | Slide 10
Complexity & Customization
Battery Energy Storage Systems
Complete offering – from products up to complex systems
Turnkey systems with need for power
system engineering
Packaged systems with only need for product engineering
Converter platforms for storage systems without batteries
Battery from external suppliers Highly
customized turnkey storage systems
Turnkey storage systems Packaged
BESS Turnkey
BESS
Battery Energy Storage Systems EssPro™ Grid
AC Network
Network / Renewable Plant Control & Optimization
Turnkey, customized BESS solution
Control &
Protection
AC
Filter
BESS Control
Battery System
BMS BMS BMS
Grid connection
~ =
Scope of supply
Filter
DC
System Components
Converters Wide range of leading edge converters
systems
Batteries (3. Party)
Optimal battery technology for every application
Control systems &
algorithms
Integrated EssPro Grid control system enables manual and automatic
operation Protection
equipment
State-of-the-art protection systems for AC and DC equipment.
Transformers and
switchgear
LV, MV, & HV switchgear ensures safe and reliable grid connection. Full range of transformers for any local standard Modular and
scalable
Scalable & flexible systems facilitate easy and safe operation
Battery Energy Storage Systems
Equipment making up the System
Battery Energy Storage Systems Batteries
© ABB Group
September 18, 2015 | Slide 14
• ABB has no own brand batteries
• We work with all battery manufactures
• We have strategic partner agreements with all the major manufacturers
• Examples of Battery Partners
EssPro™ EPIC
Electrical Plant and Inverter Controller
Multiple processor architecture combined with full software functionality makes perfect solution for hosting local control and transmission applications
True battery and converter independence provided by platform gives flexibility to tailor according customer needs
Different communication protocols 101, 104, IEC 61850, DNP 3.0, Modbus and Modbus tcp gives freedom to integrate seamlessly
Variaty of different operation modes available from network control centres, locally and web based
Data logging features of analogue and binary signals and storing in data files
Standard applications (eg. frequency regulation, ramp rate etc.) integrated into PLC with option of extending it to client specific algorithms
Virtual battery energy storage control for selecting and parameterization of applications
Integration with optimizer ESSCON connected to
Converter Technology overview
© ABB Group
September 18, 2015 | Slide 16
MV - HV range
~20MW – 70MW rating LV range
~25kW – 2,5MW rating
LV - MV range
~200kW – 30MW rating
Optimized converters Typical grid connection levels
ESI PCS 100 DynaPeaQ PCS 8000
MV - HV range
≥30MW rating
Battery Energy Storage Systems
ABB energy storage converter portfolio
Batteries, flywheels, super-capacitorsPumped hydro
© ABB Group
September 18, 2015 | Slide 18
User Benefits
Power system load leveling (deferred network and generation investment)
Grid stabilization (increased use of renewables)
Grid compliance for renewable and generation systems
Power quality improvement
Features
Dynamic power control (P) and reactive power control (Q)
Harmonic mitigation up to 50th
Islanding mode & Blackstart
CAN communication
Modularity (several units can be put in parallel) for high-current applications
Full redundancy and flexibility (master/master configuration and independent DC busses)
© ABB Group
September 18, 2015 | Slide 18
Battery Energy Storage Systems ESI converter (25-2500kW)
ESI-I ESI-M ESI-S
Battery Energy Storage Systems PCS100 Converter (0,2 – 30MW)
User Benefits
Power system load leveling (deferred network and generation investment)
Increases network stability and transmission capacity (increased use of renewable)
Modular design for highest availability, based on LV converter platform especially
Features
Dynamic power control (P)and reactive power control (Q)
Generator emulation control mode
Grid stabilization features (synthetic inertia and active damping)
High and low voltage ride through
Island mode & Blackstart
Cabinets
Racks
Complete
References
September 18, 2015
| Slide 20
© ABB Group
Battery Energy Storage Systems Denmark – 2012
PCS100 Converter
400kW
Battery Energy Storage Systems Denmark – 2015
ESI-M Inverter
150A
Customer’s need
Windpower connected to grid
Demonstration project
Peak shaving and balancing loads
Charging of electrical vehicles ABB’s response
PQF and battery enclosure
75 kW for up to 60 minutes
Li-Ion Batteries
Battery Energy Storage Systems
Sweden - 2012
ABB Energy Storage Experience EKZ – Zürich - Switzerland
1MW for 15 minutes
Peak shaving
Frequency regulation
EV charging
PV integration
Islanding
Installed in 2012
ABB Energy Storage Experience 2MW PCS100 ESS Project
Application
Frequency Regulation
Location
Beijing
Installed in 2013
On Going
ABB Energy Storage Experience
Chile, 20 MW Energy Storage System
© ABB Group
September 18, 2015 | Slide 26
Customer needs
Spinning Reserve
Frequency Regulation
ABB Scope
5 x 4 MW PCS Containers containing Inverters, circuit breakers, step up transformers, control, MV Disconnect Switch
Li-Ion Batteries
Installed in 2011
20 MW / 5MWHr
Battery Energy Storage Systems SVC Light, EDF Energy – 2011 United Kingdom
Customer need
Wind farm connection and test bench for energy storage together with
Durham University ABB’s response
Battery energy storage system
SVC Light, ratings: 200 kW 1 h, 600 kW 4 min at 11 kV and +/-600 kvar
State of the art Li-ion batteries
© ABB Group
September 18, 2015 | Slide 28
Battery Energy Storage System Palermo, Italy – 2013
Customer need
Battery energy storage facility connected to the distribution grid
ABB response
Turnkey BESS providing 2MW for 30 minutes including system studies and specification
Containerized Li-ion-battery based solution including converter, transformer, switchgear, control and
protection systems
Standard control algorithms Customer benefits
Peak shaving, frequency regulation and integration of renewables
State-of-the-art technologies enabling to address future demands on the grid
ABB Energy Storage Experience HELCO Projects
100 kW / 248 kWHr
Customer needs
Site #1 – West Health Civic Center
Demand Reduction
Load Shifting / PV Array
Site #2 - Koyo Bottling Company
Voltage Support
Demand Reduction
ABB Scope
Indoor PCS including inverters, dc contactors, ac circuit
breakers, control and isolation transformer
Dynamic Control
Installed in 2012
ABB Energy Storage Experience United States Utility
© ABB Group
September 18, 2015 | Slide 30
Customer needs
Demand Reduction
Renewable Energy Integration
ABB Scope
ABB supplied PCS, including isolation transformer and
disconnect switch and metering cabinet
Li-Ion Battery Supplier
Installed in 2012
500 kW / 1.5MWHr
ABB Energy Storage Experience
Cowessess Nation / Sask Power BESS
(1) X 200 kW / 200 kWHr
Customer needs
Wind Integration.
Customer wanted BESS to smooth out wind turbine output.
Demonstrate Anti-Islanding functionality
ABB Scope
(2) x 200 kW Indoor PCS including inverters, dc contactors, ac circuit breakers, control and external isolation / step-up transformer to 23kV grid
Dynamic Control Algorithms / Site Energy Control
Installed in 2012
ABB Energy Storage Experience
10*250kW PCS100 ESS SGCC Project
Application
Grid connection
Peak shaving of the DG(wind/solar)
Integration of renewable energy
Location
China Zhangbei
Status
Installed in 2012
ABB Energy Storage Experience
100kW PCS100 ESS Taiwan Project
Application
Micro. Grid /Island /grid connect
Peak shaving of the micro. Grid
Integration of renewable energy
Location
Taiwan
Installed in 2011
ABB Energy Storage Experience
2*200kW PCS100 ESS Indonesia Project
Application
Grid connection
Integration of renewable energy
Location
Indonesia
Status
Installed in 2011
ABB Energy Storage Experience BESS – NYPA, Garden City, NY
1MW / 6.5MWh Installed in 2006
Customer needs Load Leveling Peak Shaving ABB Scope
ABB PCS to work in parallel with local utility during day to power gas
compressors and recharge at night when electricity rates are lower.
Shifts compressor demand to night.
Lowers daytime peak demand rates paid by end user.
Utility benefits by reduction of peak demands on overburdened system
BESS system provides backup power in a utility interruption.
NaS Batteries
Converter Ni-Cd Batteries
ABB Energy Storage Experience
Ni-Cd BESS (Golden Valley Electric Association, Alaska, USA)
Customer Needs
40 MW for 7 min (4.7 MWh) 27 MW for 15 min (6.75 MWh) Battery life time: 20 years
Applications:
Backup Power in case of line loss Spinning reserve
Reactive power compensation
In operation since 2003
ABB Energy Storage Experience
American Electric Power, Gahanna OH
PCS and Battery Enclosures 500 kW PQ (30 seconds)
100 kW (720 kWh) Peak Shaving Installed in 2002
Customer needs
Demonstration project Peak Shaving
Power Quality
ABB response
ABB PCS to monitor grid voltages for disruptions, sags and swells. If an out of tolerance voltage event occurs, the PCS will disconnect the load from grid and power from batteries. Reconnect to grid when nominal voltage returns
NaS Batteries
© ABB Group
September 18, 2015 | Slide 38