• Ingen resultater fundet

Meeting the challenge of business change

N/A
N/A
Info
Hent
Protected

Academic year: 2022

Del "Meeting the challenge of business change"

Copied!
22
0
0

Indlæser.... (se fuldtekst nu)

Hele teksten

(1)

Meeting the challenge of business change

(2)

One team identifying the challenge…

?

Barclays challenge

? Employer of choice

? Cost reduction

?

The Barclays/JCI relationship

? Long standing partnership

? Change is the only constant

? Collaboration at all levels

?

2 organisations have fused their skill sets to create

‘one team’

Agenda for Change

(3)

Executive

Johnson Controls (JC) Vice Presidents:

Roy Cloudsdale Eric Auzepy , Guy Holden

Client Management

JC Operations Director:

Mark Graveney

JC Strategic Account Director:

Leigh Carter

JC Consulting Discipline owners:

David Sterry & Kenneth Raisbeck

Operational Mgmt.

JC Local Operational Managers JC Project Managers JC Lead Consultants

Service Delivery

JC client centric operations teams

Barclays Group Property Director:

Graham Brammer FM Director:

Richard Walton

Barclays Service Directors:

Andrew Gardiner, Karen Pleva Strategy & Technical Managers

Barclays Informed Clients Barclays Service Manager:

Shaun Newton Barclays Change Manager:

Margaret Kendall

Barclays end users:

Malcolm Hill Gary Harris Sandra Martin

Building user groups and guides

Business Operating System (BOS)

Project Management and Transition Management tools

Focus groups Formal reviews using

Performance

Dashboard and Customer Sats.

Joint workshops Joint business objective

sharing meetings

Strategy

Implementation

Delivery

one team

business change

strategyimplementationdelivery

Agenda for Change

(4)

Agenda for Change

? Ongoing relationship rather than individual projects

? Seamless transition to BAU teams

Business as Usual - Ongoing Partnership Partnership Outputs

Partnership Outputs

Poole HRSS Workplace

Re-engineering Canary Wharf Executive Dashboard

Project Jamaica Central London Property Rationalisation

Annual Joint Business Plan

(5)

Project 1

New World HR Shared Services Programme

(6)

Create a superior HR service centre that presents Barclays as the employer of choice

Create a one team environment where teams work together seamlessly

Foster a high performance culture which embodies interaction and team spirit

Drive

performance

Build pride and passion

Grow talent

& capability

Introduction

(7)

Define

? Barclays House Poole - a “World Class Contact Centre”

? Aspiration for a workplace capable of supporting new working practices and reflect the New World HRSS business model

? A catalyst for organisational change

? Actively support the HRSS team through the improvement and re-engineering of their workspace.

? HHC = 270, located over two floors

? Density = 17 sqm

? Inflexible space

? Stove piped

? Ad-hoc image/brand

? Lack of ownership

? Cost inefficiencies around office churn

(8)

Design

Staff involvement in design process, including:

? Pre Occupancy Questionnaire

? Roadshow event

? Big Picture / Little Picture

? Focus groups

? Steering committee

HRSS Transformation

(9)

Build

No of Customers

One Two Three Four Pilot Wave Wave Wave Wave No of

Staff

Oct 01’ Jan 02’ Jun 02’ Oct 02’ Jan 03’

4,500 27,000 47,000 65,000 95,000

12 340 388

?

Establish user requirements

?

Provide a flexible, scaleable workplace

?

Attain ‘buy-in’ from the users

?

Ensure transition did not interrupt HRSS business continuity

?

Reduce operational costs, whilst improving overall quality

?

Create a workplace that promotes team spirit and embraces communication

(10)

Business Change

?

Identify principal stakeholders and accountable decision makers

?

Identify resistance – manage perceptions

?

Managed explicitly - project and implementation

?

Use the environment as a catalyst to drive

behavioural and organisational change

(11)

Optimise

Benefits included:

? 4640m2 to 3670m2

? 17m2 to 10m2 per HHC

? Reduced downtime

? Sickness

? Attrition (16%-6%)

? Call Centre performance

? Organisational/Cultural change

Impact on Productivity

-5 0 5 10 15 20 25

Pre Post

% satisfied

Facilities Environment

+7.1%

+24.4%

Impact on Productivity

-5 0 5 10 15 20 25

Pre Post

% satisfied

Facilities Environment

+7.1%

+24.4%

(12)

Partnership Value

Mean Satisfaction with Facilities

70 75 80 85 90

Pre Post

% satisfied

5th 7th

+2.0%

- 2.7%

Control

Mean Satisfaction with Facilities

70 75 80 85 90

Pre Post

% satisfied

5th 7th

+2.0%

- 2.7%

Control

Mean Satisfaction with Environment

70 75 80 85 90

Pre Post

% satisfied

5th 7th

+4.2%

+7.1%

Control

(13)

Project 2

Central London Portfolio Rationalisation

(14)

Introduction

?

Double economic value every four years

?

Reduce costs overall by £1bn

?

Reduce accommodation costs in support of the productivity and cost programme.

? All functions

? All central London sites

? Implementation of space standards

? Record management opportunities

(15)

Define

?

Introduce flexible working environments that can be road tested to create an enriched working

environment - (reducing ownership)

?

Release office space resulting in a tangible benefit in support of GCF meeting their Group Cost Challenge

?

Provide the cost-savings over a short timescale (prior to move to Canary Wharf) <2005

?

Reduce support costs (reprographics & stationary)

(16)

Design

Grouped services facilitate a large open plan space for workstations

High screened carrels for quiet solitary reading &

working

Freeform mobile and fixed workstations create a flexible, versatile working environment

Vibrant, relaxed breakout space, featuring soft seating & low coffee table Small meeting

room for one to one meetings or solitary reading/working

Screened off storage and office resources

? No budget for IT & telephony

? Additional scope was identified mid-project so the team proceeded at risk

? Lack of swing space to support the relocation process

(17)

Build

Your Role

? Act as a central point of contact for the business group you represent

Answer questions regarding the

project

Help remove

“blockages”

Be open-minded to the potential

outcomes

Be Positive!

Deliverables & Next Steps

? Communicate to business users what and why this study is happening

? Arrange interviews with BU leaders, working with Johnson Controls

? Answer questions that arise (and feed them back to Johnson Controls)

? Act as a point for review to clarify business unit leader outputs

? Business champions identified:

? act as change agents (attitudes and behaviors)

? take ownership

? provided with guidelines / coaching

? The growing partnership:

? BAU relocations team

? ‘Virtual team’ including FM & supply partners (eg.

Pinnacle, Enable)

? Project Implementation Reviews:

? allowed learnings to be integrated into remaining phases

(18)

Operate

? Partnership aimed at influencing behaviours & work culture to create real business change

? Actively managed shared risk & issues log allowed mitigation of potential impacts

? Business champion network to facilitate project

communication/ representation with the business e.g.

working with FM team to develop centralised room &

resource booking facility to support increased densities

? Accountability in business for sign-off

(19)

Optimise

The tangible objectives of the project were delivered:

? Financial benefit of £5.68m

? Release of 42,730 sq ft

? Storage/archive wins (37% reduction in storage/HHC)

? Centralised stationery (including 12% cost-saving)

? Reprographics

with the additional benefits of:

“Getting to the heart of the process, changing work

practices and making real business change”, which can be further tested prior to implementation at Canary

Wharf”

(20)

?

Lessons learnt fed into Canary Wharf HQ design

? Workspace design

? Stationary management

? Bulk reprographics

? Reception services

? Working together (customer service) programme

?

Continuous learning

? Project implementation reviews

? Pilot studies

?

Improved communications

? Roadshows

? Newsletters

? Web enabled room booking

Partnership Value

(21)

Delivering Real Value

?

Space

? HRSS project increased occupational density from 17sqm to 10sqm

? London restack allowed early release of 43,000sqft

?

Cost

? HRSS reduced operational cost by over 25%

? London restack provided cost savings of £5.6m

? FM cost savings 2000-2003 over £5m

?

Quality

? ServQual (industry customer satisfaction benchmark) scores increased by 9.76%

(22)

Meeting the challenge of business change

Referencer

RELATEREDE DOKUMENTER

It’s a great pleasure to welcome you to the annual meeting 2021 for the Danish Society of Anaesthesiology and Intensive Care Medicine (DASAIM).. The venue for DASAIMs annual meeting

Most specific to our sample, in 2006, there were about 40% of long-term individuals who after the termination of the subsidised contract in small firms were employed on

Fig 1. Changes of the numbers of food items in the different food baskets and their cost when subjected to diversification. A) Changes in the number of different foods in the FBs

We found large effects on the mental health of student teachers in terms of stress reduction, reduction of symptoms of anxiety and depression, and improvement in well-being

• only 41% of patient referrals are sent electronically in Denmark which made it possible to obtain current data for the study from organisations using electronic systems and

Challenge for retailing formats: Value mismatch In a multichannel business model, the retailer chooses a mix of customer value-adding or cost-lowering chan- nels to create

A) Increasing the number of Hubs may not be a cost-effective choice for some time in order to amortize the cost for electro-optical conversion and for the Optical NoC

The sum of the differences between the cost items from Batch to Inventory in the Unique Modules and Common module columns, respectively, constitutes the