The listings below represent a collection of projects selected by the market actors. The list covers demonstration plants and plants in commercial operation.
14.1 Babcock & Wilcox Vølund A/S
Plant name Harboøre Varmeværk (DH plant)
Location Industrivej 1, 7673 Harboøre
Year/month of commission 1993 Owner type
(Domestic, industrial, energy provider etc.)
Joint ownership (BWV & Harboøre Varmeværk)
Fuel Wood chips
Capacities
(Input and output)
Please see above for energy balance Principles/description Please see above for process description Actual operational hours > 130.000/90.000 hours (Gasifier/Gas engine) Observed annual efficiencies app. 92%
Investment and public funding > 110 MDKK Status
(In operation, not in operation etc.)
In operation Number of plants of same type 1
Contact information
Strategy for research, development and demonstration of thermal biomass gasification in Denmark
Annex 2 - List of current Danish gasification plants Page 124
14.2 BioSynergi Proces ApS
Plant name Castor pilot plant
Location Græsted, Denmark
Year/month of commission 2003 Owner type
(Domestic, industrial, energy provider etc.)
Manufacturer owned
Fuel Forest wood chips, moisture content up to 52
%, wet basis Capacities
(Input and output)
340 kW thermal electricity 75 kW heat 165 kW
Principles/description Open Core fixed bed gasifier
Actual operational hours 3800 h with electricy production, 6000 h in total Observed annual efficiencies Not used for regular production
Investment and public funding Yes Status
(In operation, not in operation etc.)
Used for development projects Number of plants of same type 0
Contact information BioSynergi Proces ApS
Strategy for research, development and demonstration of thermal biomass gasification in Denmark
Annex 2 - List of current Danish gasification plants Page 125
14.3 DONG Energy A/S
Plant name 6MW demonstration plant
PSO project B4C
Location DONG Energy Asnæs, Kalundborg
Year/month of commission 1/3 2011 Owner type
(Domestic, industrial, energy provider etc.)
Private, DONG Energy is 100% owner
Fuel Straw
Capacities
(Input and output) 6MWth, corresponding to 1.5 tonnes/h Principles/description Low temperature circulation fluidised bed Actual operational hours At present during commissioning
Observed annual efficiencies
Investment and public funding Total project is DKK 90 million, DKK 35 million from PSO
Status
(In operation, not in operation etc.) During commissioning Number of plants of same type 0
Contact information andbo@dongenergy.dk
Strategy for research, development and demonstration of thermal biomass gasification in Denmark
Annex 2 - List of current Danish gasification plants Page 126
14.4 EP Engineering ApS
Plant name CCG Phase A
Location Herlufsholm School and Manor
Year/month of commission August 2010 Owner type
(Domestic, industrial, energy provider etc.)
Domestic
Fuel Wood chips
Capacities
(Input and output) Demonstrated 400 kW boiler capacity. Can be improved.
Principles/description Vibrating fluidized fuelbed.
Actual operational hours Around 1000 Observed annual efficiencies -
Investment and public funding More than 5 mio. DKK/public funding 0 Status
(In operation, not in operation etc.) In operation Number of plants of same type 1
Contact information EP Engineering +45 40 615 600
Strategy for research, development and demonstration of thermal biomass gasification in Denmark
Annex 2 - List of current Danish gasification plants Page 127
14.5 Organic Fuel Technology A/S
Plant name OFT CDP 1000
Location Aagårdsvej, Ødum, 8370 Hadsten and (Pier 1,
Harbour, Randers) Year/month of commission 2008
Owner type
(Domestic, industrial, energy provider etc.)
Industrial (oil production only)
Fuel Mainly straw (as pellets)
Capacities
(Input and output)
100 kg of straw / ~30 liter of raw oil) Principles/description
Actual operational hours 150 – 200 running hours (batch process) Observed annual efficiencies
Investment and public funding Status
(In operation, not in operation etc.)
OFT CDP 1000 operates as a test bed periodically with an output of ~30 liter.
Number of plants of same type 1 Contact information
Strategy for research, development and demonstration of thermal biomass gasification in Denmark
Annex 2 - List of current Danish gasification plants Page 128
14.6 Stirling DK ApS
Plant name Flensburg
Location Langballig, Germany
Year/month of commission 2009/12 Owner type
(Domestic, industrial, energy provider etc.)
Energy provider
Fuel Wood chips
Capacities
(Input and output) 400 kW input, 70 kWe and 280 kWth output Principles/description CHP plant with 800 kW updraft gasifier and two
Stirling engines
Actual operational hours ~2,000 hours on each engine Observed annual efficiencies 15 % (elec.)
Investment and public funding Investment: ~ €500,000, public funding: ? Status
(In operation, not in operation etc.) In operation Number of plants of same type 0
Contact information Annabell Möller, tel.: +45 88184807
@ am@stirling.dk
Plant name DTU
Location Lyngby, Denmark
Year/month of commission 2009/09 Owner type
(Domestic, industrial, energy provider etc.)
State org.
Fuel Wood chips
Capacities
(Input and output) 200 kW input, 35 kWe and 140 kWth output Principles/description CHP plant with 200 kW updraft gasifier and one
Stirling engine Actual operational hours 3,000 hours Observed annual efficiencies 15 % (elec.)
Investment and public funding Investment: ~ €242,000, public funding: 0 Status
(In operation, not in operation etc.) In operation
Strategy for research, development and demonstration of thermal biomass gasification in Denmark
Annex 2 - List of current Danish gasification plants Page 129 Number of plants of same type 2
Contact information Jakob Falther, tel.: +45 88184806
@ jbf@stirling.dk
Plant name Barrit
Location Barrit, Denmark
Year/month of commission 2010/10 Owner type
(Domestic, industrial, energy provider etc.)
Agriculture
Fuel Wood chips
Capacities
(Input and output) 600 kW gasifier, 35 kWe and 140 kWth output Principles/description CHP plant with 200 kW updraft gasifier and one
Stirling engine Actual operational hours 200 hours Observed annual efficiencies 15 % (elec.)
Investment and public funding Investment: ~ €170,000 (second-hand plant), public funding: 0
Status
(In operation, not in operation etc.) In operation Number of plants of same type 2
Contact information Jakob Falther, tel.: +45 88184806
@ jbf@stirling.dk
Plant name Ireland
Location Carlow, Ireland
Year/month of commission 2011/01 Owner type
(Domestic, industrial, energy provider etc.)
Research Institute
Fuel Wood chips
Capacities
(Input and output) 800 kW gasifier, 35 kWe and 140 kWth output Principles/description CHP plant with 200 kW updraft gasifier and one
Stirling engine Actual operational hours 100 hours Observed annual efficiencies 15 % (elec.)
Strategy for research, development and demonstration of thermal biomass gasification in Denmark
Annex 2 - List of current Danish gasification plants Page 130 Investment and public funding Investment: ~ €260,000, public funding: ? Status
(In operation, not in operation etc.) In operation Number of plants of same type 2
Contact information Jakob Falther, tel.: +45 88184806
@ jbf@stirling.dk
Plant name BlackCarbon
Location Barrit, Denmark
Year/month of commission 2008/12 Owner type
(Domestic, industrial, energy provider etc.)
Industrial
Fuel Un-treated wood
Capacities
(Input and output) 400 kW input, 35 kWe and 140 kWth output Principles/description CHP plant with 400 kW pyrolysis unit and one
(1) Stirling engine producing 23 kg biochar pr.
hour (when operated at nominal load 300 kW input to pyrolysis unit)
Actual operational hours 2,400 hours Observed annual efficiencies 10 % (elec.)
Investment and public funding Investment: ~ €250,000, public funding: ? Status
(In operation, not in operation etc.) In operation Number of plants of same type 0
Contact information Gitte Videcrantz, tel.: +45 88184804
@ gv@stirling.dk
Strategy for research, development and demonstration of thermal biomass gasification in Denmark
Annex 2 - List of current Danish gasification plants Page 131
14.7 Weiss A/S
Plant name 500 kWe twostage in Hillerød
Location Hillerød Forsyningsselskab
Year/month of commission 2011 Owner type
(Domestic, industrial, energy provider etc.)
Destrict heating
Fuel Wood chips
Capacities
(Input and output)
1500 kW input 500kWe output 900kWth output
Principles/description Gasproduction from wood chips, in at two stage gassifier. Wifh no gascleaning the gas is used in a engine.
Actual operational hours 0 Observed annual efficiencies 0
Investment and public funding The project is founded by PSO with 10 mill.
And the investment is expected to be 20 mill.
Status
(In operation, not in operation etc.)
The equipment is expected to be installed in august 2011.
Number of plants of same type Viking gasifier 20 kWe Hadsund gasifier 200 kWe.
Contact information
Strategy for research, development and demonstration of thermal biomass gasification in Denmark
Annex 2 - List of current Danish gasification plants Page 132
14.8 Aaen A/S - Skive District Heating
Plant name I/S Skive Fjernvarme
Location Skive
Year/month of commission 2008 Owner type
(Domestic, industrial, energy provider etc.)
Private municipal approved district heating company
Fuel Wood pellets
Capacities
(Input and output) See description above Principles/description See description above Actual operational hours 6.500 hrs.
Observed annual efficiencies Electricity: 0,24 Heat: 0,70
Investment and public funding Investment DKK 280 mio.; public funding DKK 35 mio.
Status
(In operation, not in operation etc.) Partly in operation Number of plants of same type 1
Contact information bs@aaenas.dk
Strategy for research, development and demonstration of thermal biomass gasification in Denmark