Market Dialogue:

Process for environmental assessments

Chief Advisor Jeppe Lundbæk Danish Energy Agency,

Copenhagen, 25 Nov 2019

Danish Energy Agency

(2)

New environmental assessment process

• New approach to environmental assessments for the Thor Offshore Wind Farm

• Result of the Danish Energy Appeal Board decision on Vesterhav Syd offshore wind farm of 20 December 2018 (rejection of the environmental impact assessment process and permit for that project).

• New and more solid approach designed with two key objectives in mind:

1) minimizing process-risk for the developer in terms of claims/appeals over permitting process

2) minimizing environmental/planning risks by undertaking mitigating measures that seek to eliminate key risk-factors prior to submitting final bids.

(3)

The new process for EA

Elements:

1. Prior to final bids – Completion of a Strategic Environmental Assessment (SEA) of the plan for Thor

2. Prior to final bids – Completion of additional environmental surveys and studies in addition to the SEA (providing critical data for risk-mitigation, e.g. bird surveys etc.)

3. Prior to final bids – An EIA of the specific project onshore from landfall onwards to the 400 kV transmission grid in Idomlund.

4. After final bids – An EIA of the specific project offshore and up to landfall is to be carried out by the concession winner

November 26, 2019

Danish Energy Agency Page 3

(4)

The EA process in a nutshell

November 26, 2019

Danish Energy Agency Page 4

Shoreline POC

BUILDER: Construction and operation by concession winner Construction and operation by Energinet SEA of plan: SEA of plan for Thor by competent authority (DEA)

EIA of offshore facilities by concession winner

Competent authority: DEA EIA of land facilities by Energinet Competent authority: Danish EPA EIA of project:

EIA permits: EIA permit by DEA to concession winner

EIA permit by EPA to

EIA permit by EPA to Energinet

(5)

Short on an SEA

Purpose:

• The SEA will – by looking at the “plans” for Thor - seek to qualify if a later project can be expected to meet protection requirements

• The Strategic Environmental Assessment (SEA) will not address impacts on a project specific level

• The SEA will assess potential impacts from a prospective wind farm at the Thor-site based on latest information and data about species distribution, vulnerability and impacts etc.

• The SEA will provide documentation for public consultation of the plan

• The SEA will provide background for a decision on possible adjustments to implementation of the plan with respect to environmental protection and other relevant sustainability issues

November 26, 2019

Danish Energy Agency Page 5

(6)

Areas of particular focus in the SEA for Thor

• In terms of assessing potential impacts from a prospective windfarm at the Thor-site based on latest information and data about species distribution, vulnerability and impacts etc. from other offshore windfarms we will particularly focus on:

Marine mammals and birds

• Many species of marine mammals and birds are strictly protected through the EU habitats and birds directives

• Impacts on the species from e.g. ramming of monopiles (marine mammals) and collision or displacement (birds) are often important issues in an EIA

d

(7)

November 26, 2019 Page 7

• Assessment of the visibility of the area – the coastal area

• Photo shoots from shore

• Visualisations from different spots from shore

• Defined project basis for assessment or visibility assessment

Coastal landscape and visual impact

(8)

Project dimensions for Thor (1)

Examples of dimensions of turbines to be used for analyzing possible visual impacts:

8 MW turbine 15 MW turbine

Wing diameter, m 160 235

Hub height, m 120 140

Tip height, m 210 260 These dimensions are NOT

restricting turbines to be chosen by developer later – they can be smaller, they can be larger

(9)

Project dimensions for Thor (2)

Possible examples of park layouts to be analyzed and presented at public hearings:

November 26, 2019

Danish Energy Agency Page 9

800 MW wind farm 1000 MW wind farm

8 MW turbine 15 MW turbine 8 MW turbine 15 MW turbine 100 turbines 54 turbines 125 turbines 67 turbines

Symmetric layout Random layout Symmetric layout Random layout Symmetric layout Random layout Symmetric layout Random layout

(10)

Rough timetable the SEA

Activity/milestone When

Drafting scope of SEA

Consulting concerned authorities Finalizing scope of SEA

Q4 2019

Voluntary public consultation of scope of SEA (4 weeks)

Possible amendments to scope of SEA

Q1 2020

SEA analyses and reporting Q1 – Q4

2020

SEA report Q4 2020

Public consultation of the SEA report (8 weeks) Q1 2021 Issuance of ”summary statement” for the SEA Q2 2021

Referencer

RELATEREDE DOKUMENTER

This follow-up to the Danish environmental monitoring programme on large-scale offshore wind power builds on the result of the former programme and focuses on updat- ed knowledge

From 1 February the Danish Energy Agency launches an 8-week public hearing concerning the Plan for Thor Offshore Wind Farm and the related results of the environmental

Partly based on information in the environmental impact report for the northwestern and southeastern routes on the continental shelf, the assessments of the relevant authorities

To follow up on the market dialogue on Thor Offshore Wind Farm held in November 2019, the Danish Energy Agency now publishes answers to questions raised as part of the dialogue on

The Danish Energy Agency publishes detailed material concerning central elements and questions, which will be discussed with market players at the market dialogue on 25 Nov 2019

To follow up on the market dialogue on Thor Offshore Wind Farm held in November 2019, the Danish Energy Agency now publishes answers to questions raised as part of the dialogue on

Between November 25 and 30, 2020, the Danish Energy Agency and Energinet will host a market dialogue for potential tenderers and the industry on the coming Hesselø Offshore Wind

The Danish Energy Appeal Board decision of 20 December 2018 concerning Vesterhav Syd offshore wind farm has resulted in an adjustment of the approach for undertaking