Krigers Flak CGS er en 400 MW forbindelse mellem Danmark og Tyskland
Per Obbekjær og Ole Stig Nissen februar 2022
Kriegers Flak - Combined Grid Solution
1
TEKNISKE FAKTA
2
Krigers Flak CGS er en 400 MW forbindelse mellem Danmark og Tyskland.
Anlægget inkluderer:
• En BtB HVDC VSC konverter i Bentwisch inklusive tilslutningsfelter
• 2x24 km 150 kV søkabel mellem Danmark og Tyskland
• 220 kV elektrisk filter i station Bjæverskov
• En 60-120 Mvar reaktor i station Bjæverskov
• KFE offshore platform med plads til 150/220 kV transformer, 150 og 220 kV
tilslutningsfelter (samt forberedelse for et 150 kV tilslutningsfelter til Sverige)
Der er implementeret Dynamic Line Rating på 220 kV søkablerne i forbindelse med
Kriegers Flak indføringsprojektet i Danmark.
3
Germany Denmark
OSS Baltic 2 Extension
Substation Bentwisch (BW)
OSS KFB
Extension OSS KFE
Gravity Base Foundation
Cable 1 Sea Cable 2 Sea Substation
BJ Extens.
~‒ ~ ‒
Substation Bjaeverskov (BJ)
Back-to-Back Converter Station Offshore Substation
Kriegers Flak Extension (KFE)
Sea Cables
Offshore Substation Baltic 2
Sub-Project Sub-Project Sub-Project
Substation BW Extens.
24 km
410 MW
Tendering
Offshore installation / onshore construction Testing on site / commissioning
✓
Ready for operation Engineering / production Scope or project works Existing assets
Updated status
Civil Building Converter Hall
Converter Components
MIO Master Controller
✓
✓ ✓ ✓
✓
✓
✓ ✓
✓
4
Projektet – Forløbet i korte træk
5
Projektet blev gennemført i samarbejde med det tyske energiselskab 50Hertz.
Opgaven blev sendt i EU udbudt i 2015.
Der var tale om tre hovedentrepriser:
1. KFE offshore platform - som gik til Ho Landia i Holland 2. 2x24 km 150 kV søkabel – som gik til NKT
3. BtB HVDC VSC konverter i Bentwisch - som gik til ABB (Nu Hitachi Energy)
Idriftsættelse af forbindelsen skete den 30 juni 2021, i forbindelse med overtagelsen af
konverter stationen i Bentwisch (to et halvt år senere end det som blev planlagt tilbage i
2015)
Konverter stationen i Bentwitsch
6
KFE Platformen på Krigers Flak
KFE platformen er vist i det rødt indrammede - den øvrige del af platformen er benævnt KFB tilknyttet det danske i- landføringsanlæg for vindmøllerne på Krigers Flak
7
Søkablet fra KFE til Baltic 2
8
Link til film og billeder
9
6 juli 2021 Markering af Overtagelsen af BtB
stationen i Bentwisch 1. Markeringen af linjens åbning
- Eröffnungsfilm Combined Grid Solution - CGS Inauguration - YouTube
2. Projektet kort fortalt
- Kriegers Flak Combined Grid Solution - English subtitles–YouTube
3. Stationen i Bentwitsch set fra en drone
- Drone Photos 20191210 - Google Drev
4. Transformeren ankommer til Bentwisch
- Transformer transport to 50Hertz substation Bentwisch near Rostock - YouTube
5. Hol Landia præsentation omkring bygning af platforme - Combined Grid Solution: Kriegers Flak –YouTube
6. Jan de Nul præsentation vedrørende bygning af fundamenter til platforme - Jan De Nul Group - Kriegers Flak (Denmark) - YouTube
7. NKT præsentation vedrørende kabelproduktion og kabellægning til søs - Combined grid solution for Kriegers Flak wind farm - YouTube
8. Hitachi/ABB præsentation vedrørende HVDC –ikke projekt specifik for krigers Flak - Hitachi's HVDC (High Voltage Direct Current) System - YouTube
Afrunding
10
6 juli 2021 Markering af Overtagelsen af BtB
stationen i Bentwisch
28 October 2019 KF CGS - CSC Meeting No 31 11
Back Up Slides
Præsentation omkring KF CGS BtB projektet
gennemført i Bryssel den 4 februar 2020
12
Kriegers Flak
- Combined Grid Solution KF CGS
04/02/2020 EC Workshop: Horizon 2050 power system and the role of HVDC technologies in Brussels
https://youtu.be/64h8MrR9zVU
Ole Stig Nissen, Energinet, Denmark
Sebastian Wagner, 50Hertz Transmission, Germany
Kriegers Flak
- Combined Grid Solution KF CGS
13
EC Workshop: Horizon 2050 power system and the role of HVDC technologies in a highly decentralised RES generation - Brussels, 4 February 2020
04/02/2020 EC Workshop: Horizon 2050 power system and the role of HVDC technologies in Brussels
14
Denmark
Energinet National Control Center Center
Germany
50Hertz Transmission Control Center
Center MIO Mastercontroller for
Interconnector Operation
Green – existing and newly built KF AC infrastructure Energinet Red – KF CGS Blue – existing OWP infrastructure 50Hertz Back to Back Converter Sea Cables
OSS KFE SS Extension
A common project of German TSO 50Hertz and Danish TSO Energinet, co-financed by the European Energy Program for Recovery (EU)
First hybrid interconnector/OWP system in the world - It combines:
• the radial grid connections of the German OWPs Baltic 1 & 2 and the Danish OWP Kriegers Flak with
• a cross-border interconnector between Denmark and Germany, connecting the German north- eastern region with the Danish area of Sjaelland
• controlled by MIO – a new kind of calculation and control system securing optimization of available capacities and flows of this complex system.
04/02/2020 EC Workshop: Horizon 2050 power system and the role of HVDC technologies in Brussels
Energy transport
Business as usual – Offshore wind to land – high wind scenario
04/02/2020 EC Workshop: Horizon 2050 power system and 15 the role of HVDC technologies in Brussels
16
Energy transport
Interconnector – Offshore wind to land – high wind scenario
04/02/2020 EC Workshop: Horizon 2050 power system and the role of HVDC technologies in Brussels
17
Energy transport
Interconnector – Offshore wind to land – high wind scenario
04/02/2020 EC Workshop: Horizon 2050 power system and the role of HVDC technologies in Brussels
18
Energy transport
Land to Offshore – then Offshore to land – Low/No wind scenario
04/02/2020 EC Workshop: Horizon 2050 power system and the role of HVDC technologies in Brussels
19
Energy transport
Land to Offshore – then Offshore to land – Low/No wind scenario
04/02/2020 EC Workshop: Horizon 2050 power system and the role of HVDC technologies in Brussels
Kriegers Flak CGS – Electrical System Assets
20 KFA
KFB
KFE BAZ BAE
220/150kV BwW 450MVA
380kV/150kV/30kV 400MVA
HVDC
BwC Possible extension
towards Sweden BJS220
Bjæverskov 400 kV Ishøj 400 kV
KFA: 200MW KFB: 400MW
Baltic 2: 288MW
RA4
Baltic 1: 48MW TA1
TA2
RA1 RA3
RA2
TA3
RKFA
CB01
Busbar A Busbar B PST
9 km 80 km
80 km 34 km
25 km 60 km
75 km
04/02/2020 EC Workshop: Horizon 2050 power system and the role of HVDC technologies in Brussels
KF CGS Offshore Parts – OSS extension module KFE and Sea Cables
21 KF CGS sea cables route
•
EPCI for two AC sea cables connecting OSS Ba2 with OSS KFE
•
EPCI for the HVAC offshore platform
„KFE“ as extension of Kriegers Flak OSS KFBOffshore platform KFB (installed in 2018) connects the Kriegers Flak wind park to the Danish onshore grid.
The KFB platform is combined with the extension module KFE on one gravity base foundation.
Main components on KFE: transformer (connecting point of the German with the Danish side) and switchgear.
Baltic 2 Platform: Existing and already operating.
Connecting the Baltic 2 wind park to the German onshore grid.
One of the two KF CGS AC sea cables (150kV) during installation campaign in front of KFBE platform.
04/02/2020 EC Workshop: Horizon 2050 power system and the role of HVDC technologies in Brussels
KF CGS Onshore Part - The Back to Back Converter in Bentwisch
What it do
22
• The Danish and the German transmission grids operate in different phase, which makes a transformation AC – DC – AC necessary.
• The so called back-to-back converter (BtB) - consists of two voltage source converters (VSC) – which change the AC of the Nordic synchronous area into DC and directly back to AC, now adapted to the European synchronous area.
04/02/2020 EC Workshop: Horizon 2050 power system and the role of HVDC technologies in Brussels
KF CGS Onshore Part - The Back to Back Converter in Bentwisch
How the site looks today
04/02/2020 EC Workshop: Horizon 2050 power system and 23 the role of HVDC technologies in Brussels
KF CGS Onshore Part - The Back to Back Converter in Bentwisch
How the side is structured
04/02/2020 EC Workshop: Horizon 2050 power system and 24 the role of HVDC technologies in Brussels
KF CGS Onshore Part - The Back to Back Converter in Bentwisch
Electrical System Assets
04/02/2020 EC Workshop: Horizon 2050 power system and 25 the role of HVDC technologies in Brussels
Kriegers Flak CGS
The MIO (Master Controller for Interconnector Operation)
KF CGS is the first interconnector between two countries (and bidding zones) that integrates infeed from two different national wind farms.
A new kind of calculation and control system is developed to control available capacities and flows of such a complex system.
26
Tasks of the MIO:
1. Calculating capacity for the market 2. Meet market results at POS
3. Avoid overload of equipment
4. Keep voltage limits for BtB and wind farms
1. Calculating capacity for the market
• Taking foreseen topology, equipment ratings and wind forecasts into consideration
1. Calculating capacity for the market
• Taking foreseen topology, equipment ratings and wind forecasts into consideration
2.
• In case of wind forecast errors corrections needed
• Wind
3. Avoid overload of equipment
• In case of equipment trips and forecast errors
• Limitation of
Control (EPC) operation
4.
•
•
04/02/2020 EC Workshop: Horizon 2050 power system and the role of HVDC technologies in Brussels
27
Acknowledgements
The Kriegers Flak Combined Grid Solution is granted with financial support from the European Energy Programme for Recovery (EEPR) of the European Union
Status
• OSS extension module KFE and Sea Cables was tested back in 2019
• BtB substation were energized on January 30th 2020
• Fist transmission test is scheduled for week 9, 2020
04/02/2020 EC Workshop: Horizon 2050 power system and the role of HVDC technologies in Brussels
Ole Stig Nissen, osn@energinet.dk
Sebastian Wagner, Sebastian.Wagner@50hertz.com
Thank you for the attention!
04/02/2020 EC Workshop: Horizon 2050 power system and 28 the role of HVDC technologies in Brussels