SHIPPERS’ FORUM
11 March 2021
MUTE YOUR MICROPHONE, WHEN YOU DON’T SPEAK
SWITCH ON YOUR CAMERA, ONLY WHEN YOU ARE GIVEN THE
WORD TO SPEAK
…YOU CAN ALSO WRITE YOUR QUESTION USING THE CHAT -
THE HOST WILL ASK THE QUESTION FOR YOU USE THE ‘RAISE HAND’
FUNCTION IF YOU WISH TO COMMENT OR ASK A
QUESTION…
PROGRAMME
-
13.00 Welcome,----
Clement Johan Ulrichsen, Energinet Gas TSO
13.15 Green Gas Lolland Falster, Steen Brostrup Knudsen, Energinet Gas TSO
13.25 Baltic Pipe,
Christian Rutherford, Energinet Gas TSO
13.45 Tariff Forecast and Methodology, Nina Synnest Sinvani,
Energinet Gas TSO
14.10 Gas Storage Denmark, Iliana Nygaard
Gas Storage Denmark
14.20 Supply Situation,
Christian Meiniche Andersen, Energinet Gas TSO
14.30 EU green deal & coming regulation, Torben Brabo,
Energinet Gas TSO and
Gas Infrastructure Europe (GIE)
14.50 Hydrogen Task Force Sirko Beidatsch,
European Energy Exchange
15.20 Green Hydrogen Hub, Hans-Åge Nielsen, Gas Storage Denmark
15.40 Danish Hydrogen Export Potential, Tine Lindgren,
Energinet Gas TSO
15.55 Closing Remarks
Clement Johan Ulrichsen, Energinet Gas TSO
Coff ee Br eak Coff ee Br eak
WELCOME
Clement Johan Ulrichsen, Energinet Gas TSO
• Energinet sale of emergency gas (300 GWh)
• A transfer of gas ‘in storage’
on 1 May 2021
• Deadline for bidding is 14 April 2021 at 12.00
• Sold emergency gas will be substituted fully or partly by
CALL FOR
TENDER TO
SELL GAS
7
NEW BACK-END
MARKET IT SYSTEM
In this process we will make several decisions:
• Choice of supplier
• New processes?
• Etc.
We will possibly ask some shippers on short notice for opinions on specific questions regarding this
Please contact us on gasinfo@energinet.dk if you are interested assisting us in this
Energinet to launch a public tender on a new
back-end market IT system in March 2021
MORE CAPACITY
POINTS ON PRISMA
• Today capacity at Ellund is offered on the PRISMA platform via auctions
• The capacity points Nybro, RES-Entry, Joint Exit Zone and North Sea Entry will be offered on PRISMA
• no later than October 2022
• Energinet ambition that the future
Energinet ambition to offer all capacity
points in the Danish system at one platform
EVALUATION OF JOINT BALANCING ZONE
Joint Balancing Zone with Sweden in operation for 2 years on 1 April 2021
The regulators in 2019 requested:
• TSOs (Nordion Energi and Energinet Gas TSO) shall make an evaluation after 2 years
• In dialogue with the market
User Group will be held: 26 March 2021, at 10-12
• Participation info in gas news message
FUTURE ELLUND SOUTHBOUND CAPACITY
Agreement to offer firm capacity on a ”reasonable endeavor” basis, after Tyra redevelopment Period 1: After Tyra redevelopment and until possible new LNG terminal(s) are operational in Northern Germany:
• Gasunie Deutschland will offer capacity up to 1.5 GWh/h
Period 2: After the possible new LNG terminal(s) are operational:
• Gasunie will allocate entry capacity between the LNG terminal(s) and Ellund in a non-discriminatory way depending on capacity bookings
Energinet and Gasunie Deutschland have signed a ”Letter of Intent” on securing firm
southbound capacity at Ellund
11
INCREMENTAL CAPACITY PROCESS 2021
The process will begin 1 July 2021
• As in 2019 we will run a broader Danish
incremental process in parallel with the official process for Interconnection Point Ellund
• Material on capacities will be available in April
• Important for users interested in Ellund capacity:
Give your demand indications at the
corresponding incremental capacity process at our German neighboring TSO’s, Gasunie Deutschland and Open Grid Europe.
What are your needs for future capacity?
QUESTIONS
GREEN GAS
LOLLAND-FALSTER
Steen Brostrup Knudsen, Energinet Gas TSO
GREEN GAS LOLLAND-FALSTER
Expanding the Danish gas grid to the islands of Lolland and Falster Targeting industrial consumers, allowing for biomethane production Major news February 2021:
• Government decision to go ahead with the project
• Investment decision by Energinet board
• §4 application to the Ministry of Climate, Energy and Utilities
• Preparation of construction phase – in particular
Environmental Impact Assessment (EIA) process
GREEN GAS LOLLAND-FALSTER – MILESTONES
15
Timeline towards first gas
2020 2021 2022 2024
Open Season
Investment Decision
In operation (first gas) 2023
EIA and other permits
Construction start
• Environmental Impact Assessment proces
• Securing permits
• Surveys end
• Detailed engineering
• Contract awards continued
• Construction
• Commissioning
• Capacity reservations
• Business case
• Feasibility and concept studies
• Surveys start
• EIA preparation
• Archaeological studies
• Securing land
• Procurement and contract awards
QUESTIONS
BALTIC PIPE
Christian Rutherford, Energinet Gas TSO
HDD Houstrup ✓ Nybro terminal
In 2021, construction work will take place across Denmark, onshore and offshore. Parts of the project have been concluded.
Jutland, Funen, and Zealand onshore work
STATUS OF BALTIC PIPE
CONSTRUCTION WORK PRIMO 2021
Approximately 8,750 pipes for the North Sea have arrived at the harbour in Esbjerg.
Each pipe is 1 meter in diameter and more than 12 metres long.
All in all: 40,000 tons steel and 40,000 tons concrete coating for the 105 kilometres section in the North Sea.
THE NORTH SEA
On the Danish west coast (Houstrup Beach), we have made a horizontal directional drilling of the dunes.
In October 2020, after months of hard work, we
HOUSTRUP BEACH
33 sites for storage of gas pipes have been
established in Jutland and on Funen. The laying of the pipeline west of the Great Belt will take place in 2021.
JUTLAND AND FUNEN
ZEALAND
Across Zealand – from Slagelse to Faxe – we are in the process of burying 70
kilometres of gas pipeline.
The pipe is welded together by 12-18 metres pieces. In some places, e.g. under large roads, railways or watercourses, the pipeline is drilled or pressed under.
Work on Zealand is delayed and is
expected to be finished in the summer
In the southeastern part of Zealand, we are building a compressor station.
The purpose of the compressor station is to increase the gas pressure so large volumes of gas can be sent across the Baltic Sea to Poland.
COMPRESSOR STATION
GAZ- SYSTEM’S CONSTRUCTION STATUS
P O L A N D
Preparatory works in the organization of the permanent offices are ongoing on both landfall sites
TBM deliveries are planned for mid- March in Poland and at the beginning of April in Denmark
Tunneling works are scheduled for Q2/Q3 2021
REMIT ON TIE-IN’S
IN 2021
REMIT MESSAGE ON TIE-IN’S IN 2021
Energinet Gas TSO are working to reduce the impact of the market as much as possible
REMIT message will be updated latest in the beginning of April
BALANCING 2022 -
STATUS
In the past: operational tools at TSO level Today: WDO as market based instrument
WHY WITHIN-DAY OBLIGATION (WDO)?
Domestic
consumption DK + SE:
approx. 3 bcm/y Potential flow from
Norway: approx. 10
bcm/y
HOURLY PROCESS DURING THE GAS DAY
29
Ca. 06:45: Publication of the green zone (start)
XX:00: DSO’s start collecting DMS data
XX:20: DSO’s forward DMS data to TSO/BAM From XX:20 to XX:00:
DSO’s continue to collect DSO data
Ca. XX:05:
Publication of the ASB
Ca. XX:15-XX:30: The BAM trades, if ASB is in the yellow zone Ca. XX:40: Forward
of the IASB to the individual shippers
Last process is run after the end of the gas day, to settle the last
hour of the gas day – hereafter the cash out is performed
OUTCOME OF USER GROUP 3 MARCH
1. Data quality
• Further information needed on expected quality level through Q&A and in Method Application
2. No Punishment Principle
• Individual quality percentage
• Use another price than Neutral Gas Price (as this might not be neutral in the given hour)
• Also focus on end-of-day balance, and not only yellow zone trades
3 main focus points
OVERALL TIMELINE
31
Getting close to first official consultation
NEXT STEP: CONSULTATION
IN APRIL 2021
UPSTREAM
METHODOLOGY
METHODOLOGY
FOR INTEGRATING UPSTREAM PART OF BALTIC PIPE
Consultation period:
• 21 December to 31 January 2021
• 5 written replies
• Thanks for the qualified input
Next step
QUESTIONS
Contact: cru@energinet.dk
TARIFF METHODOLOGY
& FORECAST
TARIFF METHODOLOGY
• Adjustments as follow:
• Capacity/Commodity split – 100%/0
• Long term multiplier
• Gas year vs. calendar year
• To many uncertainties makes the work difficult
• New economic regulation
• Volumes and flow after 2022
37
We are working on the changes proposed on the User Group in January. We are also looking into the consultation responses in relation to the Joint Danish market model
User Group if
needed?
TARIFF FORECAST
The model will be updated in case of:
• Publication of the annual report
• Tariff calculation for the coming gas year
• Any other significant changes in the assumptions
We will announce any changes in the Gas news on Energinet.dk
The same uncertainties makes the tariff forecast very difficult…
QUESTIONS
41
Current cases and pipeline
The Danish Utility Regulator
Energinet Shippers’ Forum DUR/TERI/PELJ March 11, 2021
Current Cases and Pipeline
Current Cases:
1. Ellund Incremental Capacity Process
- DUR and BNetzA are coordinating decisions on Joint Proposal from GUD, OGE and Energinet.
Consultation expected end March and decision by April 2021
2. Offshore tariff complaints 2011-2020
- Comparison to market practice ongoing
3. Baltic Pipe URE/DUR agreement
- Regulatory responsibility Baltic Pipe DK/PL
Pipeline:
Expected submissions of methodology for regulatory approval:
Baltic Pipe:
• New DK/S balancing model
• Integration of North Sea offshore part into the current DK/S market model
NC TAR:
• New tariff methodology from October 2022
Market Report 2020
• Focus areas: Ellund, Tyra-Rebuild, Trading
43
Publications
ACER/CEER European Green Deal Regulatory White Papers
Purpose: To deepen understanding of regulatory aspects of Green Deal issues
1
stPaper:
When and How to Regulate Hydrogen Networks?
2
ndPaper:
Regulatory Treatment of Power-to-Gas
https://acer.europa.eu/Official_documents/Position_Pap ers/Pages/default.aspx
Anthology
DUR soon to publish Volume I of its anthology on Energy Regulation in the Green Transition The anthology is a collection of contributions by leading academics, with backgrounds in
economics, law and engineering
Joint DUR-FSR-CSEI Online Book Launch Event 25
thof March:
https://fsr.eui.eu/event/energy-regulation-in-the-green- transition-an-anthology/
BREAK
SHIPPERS FORUM
11th MARCH 2021
▪ SY21+ capacity status
▪ SY21 available / not sold capacity
▪ SY21 and SY22 open for sale
▪ SY21 pricing short and interruptible products
▪ Short status on the Market Consultation
AGENDA
47
SY21+ CAPACITY STATUS
11thMarch 2021
SOLD SY21 GWh
Sold capacity (incl. long term capacity) 5066
Call Option 30/4-2021 1100
TSO Emergency 1700
AVAILABLE FOR SALE GWh
SY2021 2211
SY2022 9000
SY2023 9000
SY2024 9000
SY2025 9000
SY21 - AVAILABLE / NOT SOLD CAPACITY
2,211 GWh available for sale in SY21
▪ Ongoing process to find an appropriate way to bring the capacity to the market
▪ Customers are invited to contact us with ideas for new products
▪ In case of no sale materializes, the capacity may stay unsold
49
SY21 AND SY22 – OPEN FOR SALE
Pricing exemples:
▪ 3.00 €/MWh for 170/170 product
▪ 3.50 €/MWh for 170/85 product
▪ 4.00 €/MWh for 120/60 product
Additional flexibility:
▪ 750 €/MWh/hour/year – injection capacity
▪ 2,100 €/MWh/hour/year – withdrawal capacity
Ongoing dialogue about long term capacity 2022 and beyond
11thMarch 2021
SY21 PRICING
SHORT & INTERRUPTIBLE PRODUCTS & VARRIABLE INJECTION FEE
YEAR PRODUCT SY2020 SY2021
€/MWh/hour/year 750,00 750,00
DKK/kWh/hour/year 5,595000 5,595000
INJECTION SHORT PRODUCTS maj-21 jun-21 jul-21 aug-21 sep-21 okt-21 nov-21 dec-21 jan-22 feb-22 mar-22 apr-22
MA price, €/MWh/hour/month 90,00 90,00 125,00 250,00 250,00 250,00 250,00 125,00 125,00 125,00 90,00 90,00
MA price, DKK/kWh/hour/month (ONLINE price) 0,671400 0,671400 0,932500 1,865000 1,865000 1,865000 1,865000 0,932500 0,932500 0,932500 0,671400 0,671400
DA price, €/MWh/hour/day 6,00 6,00 8,00 17,00 17,00 17,00 17,00 8,00 8,00 8,00 6,00 6,00
DA price, DKK/kWh/hour/day (ONLINE price) 0,044760 0,044760 0,059680 0,126820 0,126820 0,126820 0,126820 0,059680 0,059680 0,059680 0,044760 0,044760
WD price, €/MWh/hour 0,25 0,25 0,35 0,70 0,70 0,70 0,70 0,70 0,35 0,35 0,25 0,25
WD price, DKK/kWh/hour (ONLINE price) 0,001865 0,001865 0,002611 0,005222 0,005222 0,005222 0,005222 0,005222 0,002611 0,002611 0,001865 0,001865
YEAR PRODUCT - WITHDRAWAL SY2020 SY2021
€/MWh/hour/year 2.100,00 2.100,00
DKK/kWh/hour/year 15,666000 15,666000
WITHDRAWAL SHORT PRODUCTS maj-21 jun-21 jul-21 aug-21 sep-21 okt-21 nov-21 dec-21 jan-22 feb-22 mar-22 apr-22
MA price, €/MWh/hour/month 90,00 90,00 90,00 90,00 90,00 600,00 600,00 600,00 800,00 800,00 800,00 800,00
MA price, €/kWh/hour/mdr (ONLINE price) 0,09000 0,09000 0,09000 0,09000 0,09000 0,60000 0,60000 0,60000 0,80000 0,80000 0,80000 0,80000
DA price, €/MWh/hour/day 12,00 12,00 12,00 12,00 12,00 24,00 24,00 24,00 48,00 72,00 120,00 120,00
DA price, DKK/kWh/hour/day (ONLINE price) 0,08952 0,08952 0,08952 0,08952 0,08952 0,17904 0,17904 0,17904 0,35808 0,53712 0,89520 0,89520
51
MARKET CONSULTATION – SHORT STATUS
❑ The consultation was announced on January 27
thand closed on February 22
nd❑ 87% participation in relation to the number of all active storage customers
❑ GSD has invited all participants for further discussions during March/April
If there are storage customers or other market players, who regret that they have not
participated → please contact us
CONTACT
QUESTIONS?
SUPPLY SITUATION
Christian Meiniche Andersen, Energinet Gas TSO
SUPPLY SITUATION SPRING 2021
• Cold February result in high utilization of EU Storage
• Safe Storage Level (SSL) shows effect on Danish storage
• Filling requirements release 46 GWh/d from March 1.
• 100% Ellund = 136 GWh/d
EFFIS - Long-term monthly forecast of temperature and rainfall
anomalies (europa.eu)
17-02-2021
Sagsdokument: 21/01562-5 55
ELLUND ENTRY BOOKINGS AND FLOW
SSL 2020/21 AND STORAGE BOOKING 21/22
• Currently storage bookings 21/22 are less than SSL 20/21 (current year)
• Risk of gas shortage >5% (100%
utilization of Ellund entry)
• SSL might be different in 2021/22
Booked by shippers 5,1 TWh (Called options +1,1 TWh)
5%
QUESTIONS
Contact: can@energinet.dk
EU GREEN DEAL AND
COMING REGULATION
Paris 2050
Limiting global warning effect to 2°C
Climate change agenda
New Green Deal
Climate neutral by 2050
budget EU
1.1 TEUR MFF + 0.7 TEUR
NGEU
Climate Law
Binding target of 55% reduction in
2030
2015
5 years
2019
1 year
2020
December
2020
December
The European Green Deal – Focus on industry and economy
The transition is massive!
Total EU energy consumption 12-13000 TWh
Electricity Gasses Oil Coal/FS
Electrification Indirect electrification
Electrons Molecules
50-62%
Mulitplie regulatory pathways needed
(thoughts)
Scale Size
Pilots
Clusters
Scaling up
Inter- connect
Backbone
Different countries are or soon will be in different places, as their staring point with
- Existing H2 industries
- Possibility to convert networks - Need for Storage
- Abundant REN power - Possibility to blend
Gives a need for multiple regulatory pathways.
Already in the short-term!
63
Mulitplie regulatory pathways needed
(thoughts)
Time Scale
Size
Pilots
Clusters
Scaling up
Inter- connect
Backbone
Different countries are or soon will be in different places, as their staring point with
- Existing H2 industries
- Possibility to convert networks - Need for Storage
- Abundant REN power - Possibility to blend
Gives a need for multiple regulatory pathways.
Already in the short-term!
Basic regulation for all
More details Detailed
Very advan
ced
Pipelines: volumes and security of supply (EHB)
European Hydrogen Backbone in 2040:
• 23,000 km
• € 0.13 on average / kg H2 / 1000km
• 75% of converted natural gas pipelines
• 25% new pipeline
Hydrogen storage – Actual projects
BadLauchstäd, Energy Park,
GET H2 Undergound Sun
Storage, Underground Sun Conversion
Aquamarine project
(blending) HyGreen Provence,
Stopil H2,
HyGéo, Hypster RINGS
(research)
Hysecure, Centurion
Depleted fields Aquifers
Salt caverns
HyStock HyBalance
Import terminals:
Europe’s entry door to liquid hydrogen and hydrogen carriers
Decarbonising LNG at the terminal
Import and export of hydrogen carriers
“The Forum invites the Commission to consider regulatory measures addressing these challenges [importing renewable and
low-carbon gases] whilst making efficient use of LNG terminals to contribute to increased system flexibility and security of
supply.”
QUESTIONS
Hydrogen Working Group at EEX
Intention, setup and first results
69
Intention for the hydrogen working group at EEX
▪
Develop with stakeholder, interested in hydrogen, a real H2 trading market
▪ Already in an early stage, to avoid undesirable market developments
▪ Negative locked-in effects witch might results in potential market closure (e.g. bilateral long-term supply contracts with 100% coverage as in the past for natural gas)
▪ Usage of public subsidies only for a few industrial player in steel and chemical sectors
▪ Usage of hydrogen only in the steel, chemical or transportation sector, but not for heating
▪
Gather intelligence from the market & industry - collective/swarm intelligence
▪
Link trader community (power, gas, GO) and hydrogen industry to support a market based H2 market ramp-up along the entire hydrogen value chain
▪
Force standardisation in H2 industry to enable European-wide trading
▪ In quality/pureness of H2 – cross border trading!
▪ Price notation of H2 – €/MWh
▪ H2 products (commodities + GO + indices/benchmarks) + H2 trading processes
▪
Support regulator, decision maker and associations with market know-how
▪
Increase transparency for & trust into H2 business for wider public
Current setup of the H2 working group & first results
▪
Kick-off event in November 2020 with ca. 120 participants
▪ Representing 65 companies from 11 countries
▪ General support for quick market development
▪ Strong support for unbundled trading of hydrogen as commodity and GO-H2
▪ Strong support for fast introduction of a market based hydrogen index - HYDRIX
▪ Strong support for fast hydrogen trading in the spot market NL and D.
▪ Strong support for an European solution regarding GO-H2 over national ambitions
▪
More than 40 companies (8 countries) wants to join EEX H2 Working Group
▪ Ad hoc meetings planned, according speed and content of developments
▪ English language (on request: translation into German) via MS Teams
▪ For free, but with the strong intention to push the trading market development
▪ Next meeting on 23/03 to develop the hydrogen index – HYDRIX
▪ Composition of H2WG, results and further info very soon on EEX homepage
71
A. Non-discriminatory (regulated) third party access to hydrogen infrastructure
▪ Equal treatment of all customers interested in transporting, storing or blending of hydrogen
▪ Ex-ante transparency about costs for usage of infrastructure and ancillary services
▪ Increase of competition through market entry of new market player along the entire value chain (e.g. production, storage, consumption but also trading) will improve market efficiency
B. Uniform and standardised hydrogen quality in the hydrogen infrastructure
C. Establishment of an market operator (MO), who operates physical or virtual hubs (VTP) for hydrogen, e.g. with the following ancillary services based on market prices:
▪ Title Transfer Services/Nomination Services on the hub with price notation in €/MWh
▪ Balancing services to match imbalanced shipper portfolios at market prices
▪ Purity management of pure H2 grids and blending of natural gas grids
D. Mandatory blending of natural gas grid up to a predefined H2 quota by MO
▪ According regulatory predefined H2 quota in %, to kick-off the hydrogen trading market asap E. Option: Mandatory buy of H2-GO for each consumed MWh hydrogen
▪ Could kick-off H2-GO market asap; allows also virtual greenness of gas grids on a first stage F. Merger of H2 cluster into H2 markets with sufficient maturity for trading & competition
▪ Only for H2 cluster, which are today not mature by itself for trading & competition
▪ As fastest as possible, backed by MBI and paid by public subsidies during the ram-up phase G. Recognition of H2-GO for industry according GHG avoidance in RED II
First detected regulatory pillars to launch H2 trading markets
1. Enables price transparency, increase trust from policy makers, regulators and industrial players along the entire value chain - and the general public
2. Support decarbonisation and climate neutrality targets for 2050, based on hydrogen, via market based and tradable instruments/products
3. Act as catalysator and innovator to develop hydrogen from the scratch into wholesale trading markets under involvement of existing/new market players 4. Provide transparent and tradable market prices for H2 as commodity
and H2-GOs and enable trading of hydrogen in a standardised quality
5. Enables the gas industry to use existing gas infrastructure, market proved (access) regulation and market design as backbone for ramp up of EU H2 trading markets
6. Support grid/market operator to offer ancillary services as title transfer, balancing, purity, blending but also merger of H2 cluster via trading products to market prices 7. Enables, based on market price signals in €/MWh, safety for planning and invests
Why do EEX believe in hydrogen trading markets?
Thank you very much for your attention!
Miriam Brandes +49 173 7036 797
Miriam.Brandes@eex.com
Sirko Beidatsch +49 341 2156 223
Sirko.Beidatsch@eex.com
BREAK
FROM NATURAL GAS STORAGE TO ENERGY STORAGE
Hans-Åge Nielsen hni@gasstorage.dk +45 23 33 87 07
Not a commercial company
• We are state owned
• We operate critical infrastructure
But we act in a
commercial framework
• We operate on marked conditions
• We optimize our customers' value creation
Infrastructure with a purpose
The future
Production
Storage TSO
DSO
Consumer
FROM SIMPLE VALUE CHAIN TO SECTOR INTEGRATION
Case based on historical power prices:
Input
• 600 MW Electrolyzer @ 75% efficiency
• Power price for operation: <40 €/MWh
• Case period: 2019 in West Denmark
• Hydrogen supply: Flat 24/7/365 Result
• Operational hours 4122
• Storage need 400 GWh / 123 million Nm3 H2
• Storage solution: 2 caverns “Lille Torup class”
300 m
WHAT WE BRING!
A FULL PTX VALUE CHAIN
AND PERHAPS THE FIRST PUBLIC HYDROGEN INFRASTRUCTURE?
THE CONCEPT DESIGN BEHIND GREEN HYDROGEN HUB DENMARK
320 MW
200 GWh 350 MW
Strategic position in the area between Hobro and Viborg:
• Very good integration to electric grids
• In vicinity of potential H2 customers
• In vicinity of biogas production
• In vicinity of wind farms
• In vicinity of district heating customers
• Only place with salt caverns in Denmark
LOCATION LOCATION LOCATION
2 Dec 2020 81
For more info: https://greenhydrogenhub.dk/
FOUR TYPES OF SERVICES AND COSTUMERS
Sceurity of demand Price risk mitigation:
• Renewable energy
Sceurity of Supply of Green Hydrogen
• Industries
Real-time green power
• Accountability / Additionality driven
System service for power system
OUTLOOK
DEVELOPMENT OF PUBLIC HYDROGEN INFRASTRUCTURE
83
POSSIBLE ROLL-OUT OF HYDROGEN INFRASTRUCTURE
Scaling through continues value chain optimization
Linepack PtX
Refineries
CCU
System operator
PtX Biogas
PtX
Energy island
Flexible consumption
QUESTIONS?
85
DANISH HYDROGEN
EXPORT POTENTIAL
87
Power Water
H2 .
CO2
Biomass
Limited ressource
Limited ressource Unlimited ressource
Directe usage
Synthesis without carbon
Synthesis with carbon
Renewables Electrolysis
Hydrogen
Ammonia (NH
3)
Heat
Heat
Eg.:
- (Heavy) Transport (FC) - Refineries, steel
- Peak Power and Heat - Export
E.g.:
- Fuel for shipping - Fertilizers
Fx:
- Methanol, methane - Jetfuel
- Benzin & diesel - Chemical products - Etc.
N2(air)
C H C+H
H
H N
Hydrocarbons (gas or
liquids)
Oxygen
A RENEWABLE HYDROGEN VALUE CHAIN
RENEWABLE ENERGY POTENTIAL
Development of renewable energy capacity drives down the costs of green power
…And increases the share of renewables in the grid for green hydrogen production
…but causing pressure on the grid
%
10 15 20 25 30 35
RENEWABLE ENERGY INSTALLATION IN DENMARK (GW)
FLEXIBILITY WITH H2 INFRASTRUCTURE
89
Line-pack
Long-term storage
Physical flows of hydrogen Four focus areas identified in Energinet’sPtX Action Plan
GERMAN H2 IMPORT DEMAND
Denmark/Sweden Russia
Netherlands/Belgium Norway
Czech Republic
Baltic States, Finland and Poland
IMPORT
91
HYDROGEN BACKBONE FOR INTEGRATED EU MARKET
Energinet illustration Gas for Climate: European Hydrogen Backbone Study: Link
GERMANY: FROM VISION TO
PLANNING
2,5-8 GW
transport capacity
STUDY ON THE POTENTIAL FOR H2 NETWORK TO
HAMBORG
Temporary scetch of the route
340-440
km pipeline
50-60 %
Retrofit of existing pipelines
Supply/
demand dilemma
Study of concrete hydrogen
network
Market dialogue via
TYNDP process Next step Focus of study
Motivation
Publication:
April
PTX AND HYDROGEN IS A STRATEGIC PRIORITY FOR ENERGINET
*Danish only