• Ingen resultater fundet

Invitation for consultation on a Danish pilot tender for solar PV

N/A
N/A
Info
Hent
Protected

Academic year: 2022

Del "Invitation for consultation on a Danish pilot tender for solar PV"

Copied!
2
0
0

Indlæser.... (se fuldtekst nu)

Hele teksten

(1)

Invitation for consultation on a Danish pilot tender for solar PV

The Danish Energy Agency will conduct a pilot tender of price premiums for electricity from 20 MW solar PV in 2016. 2.4 MW of the 20 MW is expected to be open for installations located in Germany. The Danish Energy Agency invites comments and questions on the draft conditions for the pilot tender.

All comments to the draft conditions for the pilot tendering procedure will be taken into consideration in the preperation of the final conditions. Part of the pilot tender will be open for PV installtions located in at least one other EEA country than Denmark which has direct electrical connection to Denmark. As this cooperation needs to be based on a cooperation agreement between the countries, the final content of the tendering conditions, e.g. the type of price premium and other design elements, will reflect relevant considerations necessary for Denmark to enter into a cooperation agreement with the EEA country in question.

The final conditions for the tendering procedure combined with the related documents (contract template, template for bids etc.) will make up the final tender material which will apply when the tender is launched.

Comments and questions to the draft conditions for the pilot tender should be sent to SolarPV@ens.dk no later than 16 March 2016. All questions,

comments and answers will be published here on the website.

The Danish Energy Agency will host a dialogue meeting on the draft conditions for the pilot tender procedure on 10 March 2 pm - 4 pm at the Danish Energy Agency in Copenhagen, Denmark. If you wish to participate, please let us know at solarPV@ens.dk

Further information on the pilot tender Rasmus Zink Sørensen

Specialkonsulent

(2)

Center for Forsyning Tlf.: 33 92 67 82 rzs@ens.dk Dijana Dmitruk Fuldmægtig

Center for Forsyning Tlf.: 33 92 66 37 ddm@ens.dk

Ellise Kiersten Jensen Fuldmægtig

Center for Forsyning Tlf.: 33 92 67 36 kbj@ens.dk

Contacts

Ture Falbe-Hansen

Head of Press (+45) 2513 7846 tfh@ens.dk Laura Andersen

Press officer (+45) 3395 0906 lrsn@ens.dk

Referencer

RELATEREDE DOKUMENTER

The Danish Energy Agency publishes detailed material concerning central elements and questions, which will be discussed with market players at the market dialogue on 25 Nov 2019

The Danish Energy Agency (DEA) called for bids in the tender for solar PV with an installed capacity of less than 1 MW on 13 September 2018, with a deadline for bids on 1

The Danish Energy Agency invites the solar industry and other interested parties to send in comments and questions on the draft tender material for the pilot tender.... All comments

The Danish Energy Agency will host a dialogue meeting on the draft conditions for the pilot tender procedure on 10 March 2 pm - 4 pm at the Danish Energy Agency in Copenhagen,

The Danish Energy Agency will talk with relevant trade associations as part of the investigation into the results of the technology neutral tender 2021, just as the Danish Energy

On September 26, 2017, the Danish government and the Danish People's Party entered into an agreement to allow wind turbines and solar PV to compete to supply as much green

On the 25 th of November 2019, the Danish Energy Agency and Energinet will host a market dialogue for potential bidders and investors on the coming Thor offshore wind farm

With the publication of the contract notice in February, the Danish Energy Agency (DEA) officially launched the tender of nearshore wind farms totaling 350 MW in up to six sites..